Information Journal Paper
APA:
CopyMIRABI, MOHAMMAD, FATEMI GHOMI, S.M.T., & JOLAI, F.. (2014). A NOVEL HYBRID GENETIC ALGORITHM TO SOLVE THE MAKE-TO-ORDER SEQUENCE-DEPENDENT FLOW-SHOP SCHEDULING PROBLEM. JOURNAL OF INDUSTRIAL ENGINEERING INTERNATIONAL, 10(2), 1-9. SID. https://sid.ir/paper/309970/en
Vancouver:
CopyMIRABI MOHAMMAD, FATEMI GHOMI S.M.T., JOLAI F.. A NOVEL HYBRID GENETIC ALGORITHM TO SOLVE THE MAKE-TO-ORDER SEQUENCE-DEPENDENT FLOW-SHOP SCHEDULING PROBLEM. JOURNAL OF INDUSTRIAL ENGINEERING INTERNATIONAL[Internet]. 2014;10(2):1-9. Available from: https://sid.ir/paper/309970/en
IEEE:
CopyMOHAMMAD MIRABI, S.M.T. FATEMI GHOMI, and F. JOLAI, “A NOVEL HYBRID GENETIC ALGORITHM TO SOLVE THE MAKE-TO-ORDER SEQUENCE-DEPENDENT FLOW-SHOP SCHEDULING PROBLEM,” JOURNAL OF INDUSTRIAL ENGINEERING INTERNATIONAL, vol. 10, no. 2, pp. 1–9, 2014, [Online]. Available: https://sid.ir/paper/309970/en