Information Journal Paper
APA:
CopyDANKA, S.. (2013). ROBUST RESOURCE-CONSTRAINED PROJECT SCHEDULING WITH UNCERTAIN-BUT-BOUNDED ACTIVITY DURATIONS AND CASH FLOWS II. SOUNDS OF SILENCE: A NEW SAMPLING-BASED HYBRID PRIMARY-SECONDARY CRITERIA HARMONY SEARCH METAHEURISTIC. INTERNATIONAL JOURNAL OF OPTIMIZATION IN CIVIL ENGINEERING, 3(4), 543-561. SID. https://sid.ir/paper/329436/en
Vancouver:
CopyDANKA S.. ROBUST RESOURCE-CONSTRAINED PROJECT SCHEDULING WITH UNCERTAIN-BUT-BOUNDED ACTIVITY DURATIONS AND CASH FLOWS II. SOUNDS OF SILENCE: A NEW SAMPLING-BASED HYBRID PRIMARY-SECONDARY CRITERIA HARMONY SEARCH METAHEURISTIC. INTERNATIONAL JOURNAL OF OPTIMIZATION IN CIVIL ENGINEERING[Internet]. 2013;3(4):543-561. Available from: https://sid.ir/paper/329436/en
IEEE:
CopyS. DANKA, “ROBUST RESOURCE-CONSTRAINED PROJECT SCHEDULING WITH UNCERTAIN-BUT-BOUNDED ACTIVITY DURATIONS AND CASH FLOWS II. SOUNDS OF SILENCE: A NEW SAMPLING-BASED HYBRID PRIMARY-SECONDARY CRITERIA HARMONY SEARCH METAHEURISTIC,” INTERNATIONAL JOURNAL OF OPTIMIZATION IN CIVIL ENGINEERING, vol. 3, no. 4, pp. 543–561, 2013, [Online]. Available: https://sid.ir/paper/329436/en