مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

video

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

sound

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Version

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

View:

207
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Download:

168
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Cites:

Information Journal Paper

Title

IMPROVING FOR DRUM_BUFFER_ROPE MATERIAL FLOW MANAGEMENT WITH ATTENTION TO SECOND BOTTLENECKS AND FREE GOODS IN A JOB SHOP ENVIRONMENT

Pages

  77-88

Abstract

DRUM–BUFFER–ROPE is a THEORY OF CONSTRAINTS production planning methodology that operates by developing a schedule for the system’s first BOTTLENECK. The first BOTTLENECK is the BOTTLENECK with the highest utilization. In the THEORY OF CONSTRAINTS, any job that is not processed at the first BOTTLENECK is referred to as a free good. FREE GOODS do not use capacity at the first BOTTLENECK, so very little attention is given to them in the DRUM–BUFFER–ROPE literature. The objective of this paper is to present a methodology that improves the DRUM–BUFFER–ROPE material flow management with attention to the second BOTTLENECK and FREE GOODS. This paper presents a comparative analysis of DRUM–BUFFER–ROPE material flow management and the proposed methodology in a job shop environment. To study the impact of FREE GOODS and the second BOTTLENECK on the performance of the DBR method, 18 job shop simulation models were developed and data analysis was done for each simulation model. Lead time and throughput are the system performance measurement output parameters. The simulation result shows that the proposed methodology significantly improved the lead time and throughput.

Multimedia

  • No record.
  • Cites

  • No record.
  • References

  • No record.
  • Cite

    APA: Copy

    TANHAEI, FAHIMEH, NAHAVANDI, NASIM, & AHMADI MOTLAGH, SAYYID DAWOOD. (2017). IMPROVING FOR DRUM_BUFFER_ROPE MATERIAL FLOW MANAGEMENT WITH ATTENTION TO SECOND BOTTLENECKS AND FREE GOODS IN A JOB SHOP ENVIRONMENT. JOURNAL OF QUALITY ENGINEERING AND PRODUCTION OPTIMIZATIO, 2(1), 77-88. SID. https://sid.ir/paper/352192/en

    Vancouver: Copy

    TANHAEI FAHIMEH, NAHAVANDI NASIM, AHMADI MOTLAGH SAYYID DAWOOD. IMPROVING FOR DRUM_BUFFER_ROPE MATERIAL FLOW MANAGEMENT WITH ATTENTION TO SECOND BOTTLENECKS AND FREE GOODS IN A JOB SHOP ENVIRONMENT. JOURNAL OF QUALITY ENGINEERING AND PRODUCTION OPTIMIZATIO[Internet]. 2017;2(1):77-88. Available from: https://sid.ir/paper/352192/en

    IEEE: Copy

    FAHIMEH TANHAEI, NASIM NAHAVANDI, and SAYYID DAWOOD AHMADI MOTLAGH, “IMPROVING FOR DRUM_BUFFER_ROPE MATERIAL FLOW MANAGEMENT WITH ATTENTION TO SECOND BOTTLENECKS AND FREE GOODS IN A JOB SHOP ENVIRONMENT,” JOURNAL OF QUALITY ENGINEERING AND PRODUCTION OPTIMIZATIO, vol. 2, no. 1, pp. 77–88, 2017, [Online]. Available: https://sid.ir/paper/352192/en

    Related Journal Papers

  • No record.
  • Related Seminar Papers

  • No record.
  • Related Plans

  • No record.
  • Recommended Workshops






    Move to top
    telegram sharing button
    whatsapp sharing button
    linkedin sharing button
    twitter sharing button
    email sharing button
    email sharing button
    email sharing button
    sharethis sharing button