مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

video

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

sound

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Version

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

View:

255
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Download:

149
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Cites:

Information Journal Paper

Title

THE FINITE HORIZON ECONOMICLOT SCHEDULING IN FLEXIBLE FLOW LINES

Pages

  273-284

Abstract

 This paper addresses the common cycle multi-product LOT-SCHEDULING problem in FLEXIBLE FLOW LINEs (FFL) where the product demands are deterministic and constant over a finite planning horizon. Objective is minimizing the sum of setup costs, work-in-process and final products inventory holding costs per time unit while satisfying the demands without backlogging. This problem consists of a combinatorial part (machine assignment and sequencing sub-problems) and a continuous part (lot sizing and scheduling sub-problems). To account for these two elements, a new mixed integer nonlinear program (MINLP) is developed which simultaneously determines machine allocation, sequencing, lot-sizing and scheduling decisions. In order to reduce computational complexity, instead of solving this MINLP directly, we propose an efficient enumeration method to determine optimal solution of the model. Moreover, the performance of the proposed method is evaluated by some numerical experiments. Two other applicable cases (zero setup costs and Lot streaming) are studied and required modifications in the model formulation and the solution method are described. Finally, a case example in a PCS assembly system is presented to illustrate applicability of the mathematical model and the proposed solution method.

Cites

  • No record.
  • References

  • No record.
  • Cite

    APA: Copy

    TORABI, S.A., FATEMI GHOMI, S.M.T., & KARIMI, B.. (2005). THE FINITE HORIZON ECONOMICLOT SCHEDULING IN FLEXIBLE FLOW LINES. INTERNATIONAL JOURNAL OF ENGINEERING, 18(3), 273-284. SID. https://sid.ir/paper/355559/en

    Vancouver: Copy

    TORABI S.A., FATEMI GHOMI S.M.T., KARIMI B.. THE FINITE HORIZON ECONOMICLOT SCHEDULING IN FLEXIBLE FLOW LINES. INTERNATIONAL JOURNAL OF ENGINEERING[Internet]. 2005;18(3):273-284. Available from: https://sid.ir/paper/355559/en

    IEEE: Copy

    S.A. TORABI, S.M.T. FATEMI GHOMI, and B. KARIMI, “THE FINITE HORIZON ECONOMICLOT SCHEDULING IN FLEXIBLE FLOW LINES,” INTERNATIONAL JOURNAL OF ENGINEERING, vol. 18, no. 3, pp. 273–284, 2005, [Online]. Available: https://sid.ir/paper/355559/en

    Related Journal Papers

  • No record.
  • Related Seminar Papers

  • No record.
  • Related Plans

  • No record.
  • Recommended Workshops






    Move to top
    telegram sharing button
    whatsapp sharing button
    linkedin sharing button
    twitter sharing button
    email sharing button
    email sharing button
    email sharing button
    sharethis sharing button