مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

video

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

sound

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Version

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

View:

420
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Download:

276
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Cites:

Information Journal Paper

Title

MULTI-OBJECTIVE UNRELATED PARALLEL MACHINES SCHEDULING WITH SEQUENCE-DEPENDENT SETUP TIMES AND PRECEDENCE CONSTRAINTS

Pages

  269-278

Abstract

 This paper presents a novel, MULTI-OBJECTIVE MODEL of a parallel machines scheduling problem that minimizes the number of tardy jobs and total completion time of all jobs. In this model, machines are considered as unrelated parallel units with different speeds. In addition, there is some precedence, relating the jobs with non-identical due dates and their ready times. SEQUENCE-DEPENDENT SETUP TIMES embedded in the proposed model may vary in different machines based on their characteristics. This paper proposes a two-level mixed-integer programming for the given problem. By solving the presented model, the associated promising results show the effectiveness of this model for small and medium-sized problems, respectively.

Multimedia

  • No record.
  • Cites

  • No record.
  • References

  • No record.
  • Cite

    APA: Copy

    TAVAKOLI MOGHADAM, R., TAHERI, F., & BAZAZI, M.. (2008). MULTI-OBJECTIVE UNRELATED PARALLEL MACHINES SCHEDULING WITH SEQUENCE-DEPENDENT SETUP TIMES AND PRECEDENCE CONSTRAINTS. INTERNATIONAL JOURNAL OF ENGINEERING, 21(3 (TRANSACTIONS A: BASICS)), 269-278. SID. https://sid.ir/paper/355692/en

    Vancouver: Copy

    TAVAKOLI MOGHADAM R., TAHERI F., BAZAZI M.. MULTI-OBJECTIVE UNRELATED PARALLEL MACHINES SCHEDULING WITH SEQUENCE-DEPENDENT SETUP TIMES AND PRECEDENCE CONSTRAINTS. INTERNATIONAL JOURNAL OF ENGINEERING[Internet]. 2008;21(3 (TRANSACTIONS A: BASICS)):269-278. Available from: https://sid.ir/paper/355692/en

    IEEE: Copy

    R. TAVAKOLI MOGHADAM, F. TAHERI, and M. BAZAZI, “MULTI-OBJECTIVE UNRELATED PARALLEL MACHINES SCHEDULING WITH SEQUENCE-DEPENDENT SETUP TIMES AND PRECEDENCE CONSTRAINTS,” INTERNATIONAL JOURNAL OF ENGINEERING, vol. 21, no. 3 (TRANSACTIONS A: BASICS), pp. 269–278, 2008, [Online]. Available: https://sid.ir/paper/355692/en

    Related Journal Papers

  • No record.
  • Related Seminar Papers

  • No record.
  • Related Plans

  • No record.
  • Recommended Workshops






    Move to top
    telegram sharing button
    whatsapp sharing button
    linkedin sharing button
    twitter sharing button
    email sharing button
    email sharing button
    email sharing button
    sharethis sharing button