Information Journal Paper
APA:
CopyTAVAKOLI MOGHADAM, R., TAHERI, F., & BAZAZI, M.. (2008). MULTI-OBJECTIVE UNRELATED PARALLEL MACHINES SCHEDULING WITH SEQUENCE-DEPENDENT SETUP TIMES AND PRECEDENCE CONSTRAINTS. INTERNATIONAL JOURNAL OF ENGINEERING, 21(3 (TRANSACTIONS A: BASICS)), 269-278. SID. https://sid.ir/paper/355692/en
Vancouver:
CopyTAVAKOLI MOGHADAM R., TAHERI F., BAZAZI M.. MULTI-OBJECTIVE UNRELATED PARALLEL MACHINES SCHEDULING WITH SEQUENCE-DEPENDENT SETUP TIMES AND PRECEDENCE CONSTRAINTS. INTERNATIONAL JOURNAL OF ENGINEERING[Internet]. 2008;21(3 (TRANSACTIONS A: BASICS)):269-278. Available from: https://sid.ir/paper/355692/en
IEEE:
CopyR. TAVAKOLI MOGHADAM, F. TAHERI, and M. BAZAZI, “MULTI-OBJECTIVE UNRELATED PARALLEL MACHINES SCHEDULING WITH SEQUENCE-DEPENDENT SETUP TIMES AND PRECEDENCE CONSTRAINTS,” INTERNATIONAL JOURNAL OF ENGINEERING, vol. 21, no. 3 (TRANSACTIONS A: BASICS), pp. 269–278, 2008, [Online]. Available: https://sid.ir/paper/355692/en