Information Journal Paper
APA:
CopyFarrokh, Ebrahim. (2021). Construction time optimization for large underground excavations. IRANIAN JOURNAL OF MINING ENGINEERING (IRJME), 15(49 ), 49-66. SID. https://sid.ir/paper/415914/en
Vancouver:
CopyFarrokh Ebrahim. Construction time optimization for large underground excavations. IRANIAN JOURNAL OF MINING ENGINEERING (IRJME)[Internet]. 2021;15(49 ):49-66. Available from: https://sid.ir/paper/415914/en
IEEE:
CopyEbrahim Farrokh, “Construction time optimization for large underground excavations,” IRANIAN JOURNAL OF MINING ENGINEERING (IRJME), vol. 15, no. 49 , pp. 49–66, 2021, [Online]. Available: https://sid.ir/paper/415914/en