Information Journal Paper
APA:
CopySEYED HOSSEINI, S.M., & HATEFI, MOHAMMAD ALI. (2009). AN INTEGRATED RISK-BASED TECHNIQUE FOR PROJECT PLAN SELECTION. INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING AND PRODUCTION RESEARCH (IJIE) (ENGLISH), 20(1-2), 31-40. SID. https://sid.ir/paper/569526/en
Vancouver:
CopySEYED HOSSEINI S.M., HATEFI MOHAMMAD ALI. AN INTEGRATED RISK-BASED TECHNIQUE FOR PROJECT PLAN SELECTION. INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING AND PRODUCTION RESEARCH (IJIE) (ENGLISH)[Internet]. 2009;20(1-2):31-40. Available from: https://sid.ir/paper/569526/en
IEEE:
CopyS.M. SEYED HOSSEINI, and MOHAMMAD ALI HATEFI, “AN INTEGRATED RISK-BASED TECHNIQUE FOR PROJECT PLAN SELECTION,” INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING AND PRODUCTION RESEARCH (IJIE) (ENGLISH), vol. 20, no. 1-2, pp. 31–40, 2009, [Online]. Available: https://sid.ir/paper/569526/en