Information Journal Paper
APA:
CopySHAHNAZARI SHAHREZAEI, P., TAVAKKOLI MOGHADDAM, R., & KAZEMIPOOR, H.. (2011). SOLVING A BI-OBJECTIVE MANPOWER SCHEDULING PROBLEM CONSIDERING THE UTILITY OF OBJECTIVE FUNCTIONS. INTERNATIONAL JOURNAL OF ENGINEERING, 24(3 (TRANSACTIONS B: APPLICATIONS)), 251-262. SID. https://sid.ir/paper/575017/en
Vancouver:
CopySHAHNAZARI SHAHREZAEI P., TAVAKKOLI MOGHADDAM R., KAZEMIPOOR H.. SOLVING A BI-OBJECTIVE MANPOWER SCHEDULING PROBLEM CONSIDERING THE UTILITY OF OBJECTIVE FUNCTIONS. INTERNATIONAL JOURNAL OF ENGINEERING[Internet]. 2011;24(3 (TRANSACTIONS B: APPLICATIONS)):251-262. Available from: https://sid.ir/paper/575017/en
IEEE:
CopyP. SHAHNAZARI SHAHREZAEI, R. TAVAKKOLI MOGHADDAM, and H. KAZEMIPOOR, “SOLVING A BI-OBJECTIVE MANPOWER SCHEDULING PROBLEM CONSIDERING THE UTILITY OF OBJECTIVE FUNCTIONS,” INTERNATIONAL JOURNAL OF ENGINEERING, vol. 24, no. 3 (TRANSACTIONS B: APPLICATIONS), pp. 251–262, 2011, [Online]. Available: https://sid.ir/paper/575017/en