Information Journal Paper
APA:
CopyKUBIAK, W., & SETHI, S.. (1994). OPTIMAL JUST-IN-TIME SCHEDULES FOR FLEXIBLE TRANSFER LINES. INTERNATIONAL JOURNAL OF FLEXIBLE MANUFACTURING SYSTEMS, 6(2), 137-154. SID. https://sid.ir/paper/601823/en
Vancouver:
CopyKUBIAK W., SETHI S.. OPTIMAL JUST-IN-TIME SCHEDULES FOR FLEXIBLE TRANSFER LINES. INTERNATIONAL JOURNAL OF FLEXIBLE MANUFACTURING SYSTEMS[Internet]. 1994;6(2):137-154. Available from: https://sid.ir/paper/601823/en
IEEE:
CopyW. KUBIAK, and S. SETHI, “OPTIMAL JUST-IN-TIME SCHEDULES FOR FLEXIBLE TRANSFER LINES,” INTERNATIONAL JOURNAL OF FLEXIBLE MANUFACTURING SYSTEMS, vol. 6, no. 2, pp. 137–154, 1994, [Online]. Available: https://sid.ir/paper/601823/en