Information Journal Paper
APA:
CopyHEILMANN, R.. (2001). RESOURCE–CONSTRAINED PROJECT SCHEDULING: A HEURISTIC FOR THE MULTI–MODE CASE. OR SPECTRUM, 23(3), 335-357. SID. https://sid.ir/paper/624230/en
Vancouver:
CopyHEILMANN R.. RESOURCE–CONSTRAINED PROJECT SCHEDULING: A HEURISTIC FOR THE MULTI–MODE CASE. OR SPECTRUM[Internet]. 2001;23(3):335-357. Available from: https://sid.ir/paper/624230/en
IEEE:
CopyR. HEILMANN, “RESOURCE–CONSTRAINED PROJECT SCHEDULING: A HEURISTIC FOR THE MULTI–MODE CASE,” OR SPECTRUM, vol. 23, no. 3, pp. 335–357, 2001, [Online]. Available: https://sid.ir/paper/624230/en