Information Journal Paper
APA:
CopyFATTAHI, PARVIZ, HOSSEINI, SEYED MOHAMMAD HASAN, JOLAI, FARIBORZ, & SAFI SAMGHABADI, AZAMDOKHT. (2014). MULTI-OBJECTIVE SCHEDULING PROBLEM IN A THREE-STAGE PRODUCTION SYSTEM. INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING AND PRODUCTION RESEARCH (IJIE) (ENGLISH), 25(1), 1-12. SID. https://sid.ir/paper/637527/en
Vancouver:
CopyFATTAHI PARVIZ, HOSSEINI SEYED MOHAMMAD HASAN, JOLAI FARIBORZ, SAFI SAMGHABADI AZAMDOKHT. MULTI-OBJECTIVE SCHEDULING PROBLEM IN A THREE-STAGE PRODUCTION SYSTEM. INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING AND PRODUCTION RESEARCH (IJIE) (ENGLISH)[Internet]. 2014;25(1):1-12. Available from: https://sid.ir/paper/637527/en
IEEE:
CopyPARVIZ FATTAHI, SEYED MOHAMMAD HASAN HOSSEINI, FARIBORZ JOLAI, and AZAMDOKHT SAFI SAMGHABADI, “MULTI-OBJECTIVE SCHEDULING PROBLEM IN A THREE-STAGE PRODUCTION SYSTEM,” INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING AND PRODUCTION RESEARCH (IJIE) (ENGLISH), vol. 25, no. 1, pp. 1–12, 2014, [Online]. Available: https://sid.ir/paper/637527/en