Information Journal Paper
APA:
CopyHOSSEINI, ZAHRA SADAT, HASSAN POUR, JAVAD, & ROGHANIAN, EMAD. (2014). A BI-OBJECTIVE PRE-EMPTION MULTI-MODE RESOURCE CONSTRAINED PROJECT SCHEDULING PROBLEM WITH DUE DATES IN THE ACTIVITIES. JOURNAL OF OPTIMIZATION IN INDUSTRIAL ENGINEERING (JOURNAL OF INDUSTRIAL ENGINEERING), 8(2 (15)), 15-25. SID. https://sid.ir/paper/644532/en
Vancouver:
CopyHOSSEINI ZAHRA SADAT, HASSAN POUR JAVAD, ROGHANIAN EMAD. A BI-OBJECTIVE PRE-EMPTION MULTI-MODE RESOURCE CONSTRAINED PROJECT SCHEDULING PROBLEM WITH DUE DATES IN THE ACTIVITIES. JOURNAL OF OPTIMIZATION IN INDUSTRIAL ENGINEERING (JOURNAL OF INDUSTRIAL ENGINEERING)[Internet]. 2014;8(2 (15)):15-25. Available from: https://sid.ir/paper/644532/en
IEEE:
CopyZAHRA SADAT HOSSEINI, JAVAD HASSAN POUR, and EMAD ROGHANIAN, “A BI-OBJECTIVE PRE-EMPTION MULTI-MODE RESOURCE CONSTRAINED PROJECT SCHEDULING PROBLEM WITH DUE DATES IN THE ACTIVITIES,” JOURNAL OF OPTIMIZATION IN INDUSTRIAL ENGINEERING (JOURNAL OF INDUSTRIAL ENGINEERING), vol. 8, no. 2 (15), pp. 15–25, 2014, [Online]. Available: https://sid.ir/paper/644532/en