APA:
CopyJIANG, G., & SHI, J.. (2005). EXACT ALGORITHM FOR SOLVING PROJECT SCHEDULING PROBLEMS UNDER MULTIPLE RESOURCE CONSTRAINTS. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT (ASCE), 131(-), 986-992. SID. https://sid.ir/paper/651540/en
Vancouver:
CopyJIANG G., SHI J.. EXACT ALGORITHM FOR SOLVING PROJECT SCHEDULING PROBLEMS UNDER MULTIPLE RESOURCE CONSTRAINTS. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT (ASCE)[Internet]. 2005;131(-):986-992. Available from: https://sid.ir/paper/651540/en
IEEE:
CopyG. JIANG, and J. SHI, “EXACT ALGORITHM FOR SOLVING PROJECT SCHEDULING PROBLEMS UNDER MULTIPLE RESOURCE CONSTRAINTS,” JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT (ASCE), vol. 131, no. -, pp. 986–992, 2005, [Online]. Available: https://sid.ir/paper/651540/en