مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

video

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

sound

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Version

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

View:

360
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Download:

177
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Cites:

Information Journal Paper

Title

SCHEDULING OF UNRELATED PARALLEL MACHINES USING TWO MULTI OBJECTIVE GENETIC ALGORITHMS WITH SEQUENCE-DEPENDENT SETUP TIMES AND PRECEDENT CONSTRAINTS

Pages

  63-74

Abstract

 This paper considers the problem of scheduling N jobs on M unrelated parallel machines with SEQUENCE-DEPENDENT SETUP TIMES. To better comply with industrial situations, jobs have varying due dates and ready times and there are some precedence relations between them. Furthermore SEQUENCE-DEPENDENT SETUP TIMES and anticipatory setups are included in the proposed model. Our objective is to determine a schedule that minimizes MAKESPAN and NUMBER OF TARDY JOBs. The problem is NP-hard, so for obtaining an optimal solution, in reasonable computational time, we propose two multi objective GENETIC ALGORITHMs (MOGA). To evaluate the proposed algorithms, random test problems are produced in medium and large sizes with tight due dates. After setting the parameters, the performances of these algorithms are evaluated using the concept of DATA ENVELOPMENT ANALYSIS (DEA), distance method, and a number of non-dominated solutions.

Multimedia

  • No record.
  • Cites

  • No record.
  • References

  • No record.
  • Cite

    APA: Copy

    SAFAEI, S., NADERI, R., SOHRABI, A., & HATAMI, A.. (2015). SCHEDULING OF UNRELATED PARALLEL MACHINES USING TWO MULTI OBJECTIVE GENETIC ALGORITHMS WITH SEQUENCE-DEPENDENT SETUP TIMES AND PRECEDENT CONSTRAINTS. INTERNATIONAL JOURNAL OF ADVANCED DESIGN AND MANUFACTURING TECHNOLOGY, 8(4), 63-74. SID. https://sid.ir/paper/686730/en

    Vancouver: Copy

    SAFAEI S., NADERI R., SOHRABI A., HATAMI A.. SCHEDULING OF UNRELATED PARALLEL MACHINES USING TWO MULTI OBJECTIVE GENETIC ALGORITHMS WITH SEQUENCE-DEPENDENT SETUP TIMES AND PRECEDENT CONSTRAINTS. INTERNATIONAL JOURNAL OF ADVANCED DESIGN AND MANUFACTURING TECHNOLOGY[Internet]. 2015;8(4):63-74. Available from: https://sid.ir/paper/686730/en

    IEEE: Copy

    S. SAFAEI, R. NADERI, A. SOHRABI, and A. HATAMI, “SCHEDULING OF UNRELATED PARALLEL MACHINES USING TWO MULTI OBJECTIVE GENETIC ALGORITHMS WITH SEQUENCE-DEPENDENT SETUP TIMES AND PRECEDENT CONSTRAINTS,” INTERNATIONAL JOURNAL OF ADVANCED DESIGN AND MANUFACTURING TECHNOLOGY, vol. 8, no. 4, pp. 63–74, 2015, [Online]. Available: https://sid.ir/paper/686730/en

    Related Journal Papers

  • No record.
  • Related Seminar Papers

  • No record.
  • Related Plans

  • No record.
  • Recommended Workshops






    Move to top
    telegram sharing button
    whatsapp sharing button
    linkedin sharing button
    twitter sharing button
    email sharing button
    email sharing button
    email sharing button
    sharethis sharing button