Information Journal Paper
APA:
CopySAFAEI, S., NADERI, R., SOHRABI, A., & HATAMI, A.. (2015). SCHEDULING OF UNRELATED PARALLEL MACHINES USING TWO MULTI OBJECTIVE GENETIC ALGORITHMS WITH SEQUENCE-DEPENDENT SETUP TIMES AND PRECEDENT CONSTRAINTS. INTERNATIONAL JOURNAL OF ADVANCED DESIGN AND MANUFACTURING TECHNOLOGY, 8(4), 63-74. SID. https://sid.ir/paper/686730/en
Vancouver:
CopySAFAEI S., NADERI R., SOHRABI A., HATAMI A.. SCHEDULING OF UNRELATED PARALLEL MACHINES USING TWO MULTI OBJECTIVE GENETIC ALGORITHMS WITH SEQUENCE-DEPENDENT SETUP TIMES AND PRECEDENT CONSTRAINTS. INTERNATIONAL JOURNAL OF ADVANCED DESIGN AND MANUFACTURING TECHNOLOGY[Internet]. 2015;8(4):63-74. Available from: https://sid.ir/paper/686730/en
IEEE:
CopyS. SAFAEI, R. NADERI, A. SOHRABI, and A. HATAMI, “SCHEDULING OF UNRELATED PARALLEL MACHINES USING TWO MULTI OBJECTIVE GENETIC ALGORITHMS WITH SEQUENCE-DEPENDENT SETUP TIMES AND PRECEDENT CONSTRAINTS,” INTERNATIONAL JOURNAL OF ADVANCED DESIGN AND MANUFACTURING TECHNOLOGY, vol. 8, no. 4, pp. 63–74, 2015, [Online]. Available: https://sid.ir/paper/686730/en