Information Journal Paper
APA:
Copy. (2018). Investigating Environmental Impact Assessment (EIA) In Early Studies (Zero-Phase) to Prevent Delay in Operation of Construction Projects. Civil Engineering Journal, 4(1), 117-125. SID. https://sid.ir/paper/783961/en
Vancouver:
Copy. Investigating Environmental Impact Assessment (EIA) In Early Studies (Zero-Phase) to Prevent Delay in Operation of Construction Projects. Civil Engineering Journal[Internet]. 2018;4(1):117-125. Available from: https://sid.ir/paper/783961/en
IEEE:
Copy, “Investigating Environmental Impact Assessment (EIA) In Early Studies (Zero-Phase) to Prevent Delay in Operation of Construction Projects,” Civil Engineering Journal, vol. 4, no. 1, pp. 117–125, 2018, [Online]. Available: https://sid.ir/paper/783961/en