مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

video

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

sound

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Version

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

View:

211
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Download:

0
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Cites:

Information Seminar Paper

Title

DETERMINATION OF OPEN PIT/UNDERGROUND MINING LIMITS BY MAXIMIZING OF NET PRESENT VALUE

Pages

  -

Keywords

Not Registered.

Abstract

 Exploitation of mine deepening open pit encounters several technical and economical problems. For this reason the break-even dept for extraction of ore using open pit methods is determined. Different approaches have been proposed for determining open pit/underground limit. In this paper, using maximization of net present value (Nilsson‘s approach 1982) open pit/underground limit in NO.3 deposit of Golgohar (GEG) iron ore mine is determined. This deposit is a stratiform one and is extended in the N-S direction, the length of which is 2200 m and 2400 m in the N-S and W-E direction, respectively. Estimation for geological reserves is more than 600Mt magnetite with an average grade of Fe 53.8%. The average thickness varies from 90 to 140 m.Different scenarios have been examined for selection of optimum dept as limit between open pit and underground mining. On the basis of this research, a dept of 250 m is considered to be suitable as break-even point.

Multimedia

  • No record.
  • Cites

  • No record.
  • References

  • No record.
  • Cite

    APA: Copy

    SAYADI, AHMAD REZA, SHAHRIAR, K., KARIMINASAB, S., & SAMIMI NAMIN, F.. (2005). DETERMINATION OF OPEN PIT/UNDERGROUND MINING LIMITS BY MAXIMIZING OF NET PRESENT VALUE. PROCEEDING OF IRANIAN MINING ENGINEERING CONFERENC. SID. https://sid.ir/paper/902639/en

    Vancouver: Copy

    SAYADI AHMAD REZA, SHAHRIAR K., KARIMINASAB S., SAMIMI NAMIN F.. DETERMINATION OF OPEN PIT/UNDERGROUND MINING LIMITS BY MAXIMIZING OF NET PRESENT VALUE. 2005. Available from: https://sid.ir/paper/902639/en

    IEEE: Copy

    AHMAD REZA SAYADI, K. SHAHRIAR, S. KARIMINASAB, and F. SAMIMI NAMIN, “DETERMINATION OF OPEN PIT/UNDERGROUND MINING LIMITS BY MAXIMIZING OF NET PRESENT VALUE,” presented at the PROCEEDING OF IRANIAN MINING ENGINEERING CONFERENC. 2005, [Online]. Available: https://sid.ir/paper/902639/en

    Related Journal Papers

  • No record.
  • Related Seminar Papers

  • No record.
  • Related Plans

  • No record.
  • Recommended Workshops






    مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources
    مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources
    مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources
    مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources
    مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources
    File Not Exists.
    Move to top
    telegram sharing button
    whatsapp sharing button
    linkedin sharing button
    twitter sharing button
    email sharing button
    email sharing button
    email sharing button
    sharethis sharing button