مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

video

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

sound

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Version

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

View:

144
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Download:

0
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Cites:

Information Seminar Paper

Title

WATERBORNE CONSTRUCTION OF RUBBLE MOUND BREAKWATERS

Pages

  -

Abstract

BREAKWATERS ARE WALL-SHAPE STRUCTURES PREPARING LEE SIDE CALMNESS THROUGH WAVE REFLECTION AND DISSIPATION (DUE TO DIFFRACTION).THIS CALM BASIN ARE USED IN DIFFERENT ASPECTS AMONG THEM ARE: MOORING, BERTHING, LOADING, UNLOADING AND SECURE OPERATION OF VESSELS AND HARBOR FACILITIES PROTECTION. IMPROVING HARBOR ENTRANCE CONDITIONS TO CONTROL SEDIMENT TRANSPORT PROCESS IS ANOTHER GOAL OF BREAKWATER EXECUTION. CONSTRUCTION COSTS ARE REMARKABLY AFFECTED BY ENVIRONMENTAL FACTORS MAINLY REFERRED TO AS: WATER DEPTH, WEATHER CONDITIONS AND SEA-BED FEATURES. DEPENDING ON THE SITUATION, BREAKWATERS ARE COMMONLY ERECTED IN TWO DISTINCT WAYS: WATERBORNE & LAND-BASED. APART FROM ADVANTAGES AND DISADVANTAGES OF EITHER WAYS, SELECTION OF EXECUTION METHOD IS STRONGLY DEPENDENT ON SOME PARAMETERS LIKE: OPERATION AND COMMISSIONING DEADLINES (AS CLIENT WISHES) AND SITE SPECIFIC PROBLEMS .SITE POSITION AND SPECIAL CONDITION OF EACH PROJECT CAN EITHER MAKE OR SOLVE MANY CONSTRUCTION COST PROBLEMS. IN THIS PAPER SIGNIFICANT FEATURES OF LAND-BASED AND WATERBORNE ERECTION OF SUCH STRUCTURES HAVE BEEN COMPARED .CONSTRUCTION PROCEDURE OF PARS PETROCHEMICAL PROJECT AS A CASE HISTORY OF PAPER AND A NEW EXPERIENCE IN IRAN (ASSALUYEH PORT) HAS BEEN ADDRESSED IN DETAIL AS WELL AS COMPARING METHOD STATEMENT WITH COMMON CONSTRUCTION ASPECTS REFERRED TO IN THE LITERATURE OF PRACTICE. FINALLY SOME USEFUL RECOMMENDATIONS WILL BE GIVEN IN CONCLUDING REMARKS.

Multimedia

  • No record.
  • Cites

  • No record.
  • References

  • No record.
  • Cite

    APA: Copy

    Naserizadeh, R., & GHANBARIAN, M.. (2004). WATERBORNE CONSTRUCTION OF RUBBLE MOUND BREAKWATERS. INTERNATIONAL CONFERENCE ON COASTS, PORTS AND MARINE STRUCTURES (ICOPMAS). SID. https://sid.ir/paper/908324/en

    Vancouver: Copy

    Naserizadeh R., GHANBARIAN M.. WATERBORNE CONSTRUCTION OF RUBBLE MOUND BREAKWATERS. 2004. Available from: https://sid.ir/paper/908324/en

    IEEE: Copy

    R. Naserizadeh, and M. GHANBARIAN, “WATERBORNE CONSTRUCTION OF RUBBLE MOUND BREAKWATERS,” presented at the INTERNATIONAL CONFERENCE ON COASTS, PORTS AND MARINE STRUCTURES (ICOPMAS). 2004, [Online]. Available: https://sid.ir/paper/908324/en

    Related Journal Papers

  • No record.
  • Related Seminar Papers

  • No record.
  • Related Plans

  • No record.
  • Recommended Workshops






    مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources
    مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources
    مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources
    مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources
    مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources
    File Not Exists.
    Move to top
    telegram sharing button
    whatsapp sharing button
    linkedin sharing button
    twitter sharing button
    email sharing button
    email sharing button
    email sharing button
    sharethis sharing button