مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

video

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

sound

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Version

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

View:

239
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Download:

92
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Cites:

Information Seminar Paper

Title

CORRELATION BETWEEN THE FACTORS OF CAUSES OF DELAY IN STRENGTHENING PROJECTS

Pages

  -

Abstract

 ONE OF THE DELAYS WHICH ENGINEERS ARE FACING IS RELATED TO STRENGTHENING PROJECTS. THE AIM OF THIS STUDY WAS TO INVESTIGATE THE CAUSES OF DELAY IN STRENGTHENING PROJECTS AND EXAMINE THE CORRELATION BETWEEN THE FACTORS OF TIME OVERRUN BY USING STATISTICAL ANALYSIS SOFTWARE (SPSS). TO ACHIEVE THIS OBJECTIVE, A LIST OF SUBJECTS REPRESENTING STRENGTHENING DELAYS BASED ON AVAILABLE INFORMATION IN THE LITERATURE AND INTERVIEW WITH STRENGTHENING EXPERTS WAS OBTAINED. A FIELD SURVEY WAS CONDUCTED THROUGH A STRUCTURED QUESTIONNAIRE INCLUDING OWNERS, CONTRACTORS, UNIVERSITY’S PROFESSORS WHO HAVE A PHD DEGREE IN STRUCTURAL OR EARTHQUAKE ENGINEERING, CONSULTANT ENGINEERS, AND SUPERVISOR ENGINEERS IN MAZANDARAN AND TEHRAN. ABOUT 174 RESPONDENTS PARTICIPATED IN THE SURVEY. THE FACTORS WERE ANALYZED BY USING RELATIVE IMPORTANCE INDEX (RII). RANKING OF FACTORS AND CATEGORIES WAS DEMONSTRATED ACCORDING TO THEIR IMPORTANCE LEVEL ON DELAY. TEN MOST IMPORTANT CAUSES FROM A LIST OF 36 DIFFERENT CAUSES OF DELAY WERE: (1) DELAY IN FINANCE AND PAYMENTS OF COMPLETED WORK BY OWNER, (2) UNREALISTIC CONTRACT DURATION PLANNING, (3) SHORTAGE OF LABOR SKILL, (4) PERCEPTION OF STRENGTHENING METHODS DIFFER AMONGST STAKEHOLDERS, (5) INADEQUATE MODERN EQUIPMENT, (6) INEFFECTIVE PLANNING AND SCHEDULING OF PROJECT, (7) INADEQUATE CONTRACTOR EXPERIENCE, (8) COST OF STRENGTHENING, (9) CONTRACT PROBLEMS, AND (10) UNCLEAR STRENGTHENING STANDARDS CRITERIA. THE CORRELATION RESULTS SHOWED THAT GENERALLY THERE IS A RELATION BETWEEN DIFFERENT CAUSES OF DELAY IN STRENGTHENING PROJECT.

Cites

  • No record.
  • References

  • No record.
  • Cite

    APA: Copy

    Haghnezhad, Mina, & Khaloo, Alireza. (2016). CORRELATION BETWEEN THE FACTORS OF CAUSES OF DELAY IN STRENGTHENING PROJECTS. INTERNATIONAL CONFERENCE ON RESEARCH IN CIVIL ENGINEERING, ARCHITECTURE, URBAN PLANNING AND SUSTAINA. SID. https://sid.ir/paper/917436/en

    Vancouver: Copy

    Haghnezhad Mina, Khaloo Alireza. CORRELATION BETWEEN THE FACTORS OF CAUSES OF DELAY IN STRENGTHENING PROJECTS. 2016. Available from: https://sid.ir/paper/917436/en

    IEEE: Copy

    Mina Haghnezhad, and Alireza Khaloo, “CORRELATION BETWEEN THE FACTORS OF CAUSES OF DELAY IN STRENGTHENING PROJECTS,” presented at the INTERNATIONAL CONFERENCE ON RESEARCH IN CIVIL ENGINEERING, ARCHITECTURE, URBAN PLANNING AND SUSTAINA. 2016, [Online]. Available: https://sid.ir/paper/917436/en

    Related Journal Papers

  • No record.
  • Related Seminar Papers

  • No record.
  • Related Plans

  • No record.
  • Recommended Workshops






    Move to top
    telegram sharing button
    whatsapp sharing button
    linkedin sharing button
    twitter sharing button
    email sharing button
    email sharing button
    email sharing button
    sharethis sharing button