مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Verion

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

video

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

sound

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Version

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

View:

4,498
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Download:

0
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Cites:

1

Information Journal Paper

Title

PREDICTION OF HARD ROCK TBM PENETRATION RATE WITH NTH MODEL (CASE STUDY GHOMRUD CONVEYANCE TUNNEL)

Pages

  33-40

Abstract

 Mechanized TUNNEL BORING method is over than fifty years old. Performance prediction is one of important categories in tunneling projects and is important in selection of excavation method and type of TUNNEL BORING machine. In this paper penetration rate of Ghomrud conveyance tunnel TBM had predict with NTH model. The important advantage of this model is applying the effect of ground condition and rock mass properties. Calculations show that average penetration rate and average advance rate of machine must be 4.7 meter per hour and 20 meter per day respectively. Predictions have shown, with 28 workdays per month, excavation of this tunnel must be completed in 32 months. Maximum penetration rate of 5.04 meter per hour was predicted for foliated Jurassic sandstone, shale and slate layers and minimum penetration rate of 3.72 meter per hour was predicted for quartzite layers. Similarly maximum advance rate of 22.7 meter per day was predicted for foliated Jurassic sandstone, shale and slate layers and minimum advance rate of 11.5 meter per day was predicted for faulted zones. Therefore with comparison of TBM operation and predicted values it can be evaluated a relationship between real operation and result of applied model, for use in future excavations in tunnel root.

Cites

References

  • No record.
  • Cite

    APA: Copy

    AHMADI, MORTEZA, HEMATI SHAABANI, A., & FOROUGHI, M.. (2006). PREDICTION OF HARD ROCK TBM PENETRATION RATE WITH NTH MODEL (CASE STUDY GHOMRUD CONVEYANCE TUNNEL). IRANIAN JOURNAL OF MINING ENGINEERING (IRJME), 1(1), 33-40. SID. https://sid.ir/paper/117157/en

    Vancouver: Copy

    AHMADI MORTEZA, HEMATI SHAABANI A., FOROUGHI M.. PREDICTION OF HARD ROCK TBM PENETRATION RATE WITH NTH MODEL (CASE STUDY GHOMRUD CONVEYANCE TUNNEL). IRANIAN JOURNAL OF MINING ENGINEERING (IRJME)[Internet]. 2006;1(1):33-40. Available from: https://sid.ir/paper/117157/en

    IEEE: Copy

    MORTEZA AHMADI, A. HEMATI SHAABANI, and M. FOROUGHI, “PREDICTION OF HARD ROCK TBM PENETRATION RATE WITH NTH MODEL (CASE STUDY GHOMRUD CONVEYANCE TUNNEL),” IRANIAN JOURNAL OF MINING ENGINEERING (IRJME), vol. 1, no. 1, pp. 33–40, 2006, [Online]. Available: https://sid.ir/paper/117157/en

    Related Journal Papers

    Related Seminar Papers

  • No record.
  • Related Plans

  • No record.
  • Recommended Workshops






    Move to top
    telegram sharing button
    whatsapp sharing button
    linkedin sharing button
    twitter sharing button
    email sharing button
    email sharing button
    email sharing button
    sharethis sharing button