Information Journal Paper
APA:
CopyAMIN TAHMASBI, HAMZEH, DAGHBANDAN, ALLAHYAR, & BAGHERI, ROYA. (2017). DUAL-OBJECTIVE PREEMPTIVE MULTI-MODE RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM OPTIMIZATION MODEL. ADVANCES IN INDUSTRIAL ENGINEERING (JOURNAL OF INDUSTRIAL ENGINEERING), 51(1 ), 29-44. SID. https://sid.ir/paper/166448/en
Vancouver:
CopyAMIN TAHMASBI HAMZEH, DAGHBANDAN ALLAHYAR, BAGHERI ROYA. DUAL-OBJECTIVE PREEMPTIVE MULTI-MODE RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM OPTIMIZATION MODEL. ADVANCES IN INDUSTRIAL ENGINEERING (JOURNAL OF INDUSTRIAL ENGINEERING)[Internet]. 2017;51(1 ):29-44. Available from: https://sid.ir/paper/166448/en
IEEE:
CopyHAMZEH AMIN TAHMASBI, ALLAHYAR DAGHBANDAN, and ROYA BAGHERI, “DUAL-OBJECTIVE PREEMPTIVE MULTI-MODE RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM OPTIMIZATION MODEL,” ADVANCES IN INDUSTRIAL ENGINEERING (JOURNAL OF INDUSTRIAL ENGINEERING), vol. 51, no. 1 , pp. 29–44, 2017, [Online]. Available: https://sid.ir/paper/166448/en