مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Verion

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

video

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

sound

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Version

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

View:

1,364
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Download:

0
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Cites:

Information Journal Paper

Title

ROBUST PROJECT SCHEDULING MODEL WITH RESOURCES CONSTRAINT AND SOLVING IT BY SIMULATED ANNEALING ALGORITHM (PART OF THE PROJECT ACTIVITIES OF GAS CONDENSATE REFINERY IN BANDAR ABBAS)

Pages

  1-24

Abstract

 Scheduling plays an important role in the development and success of the project; this has always been one of the main issues considered in operations and management science researches. Another reason for the focus of much research into it is the difficult nature of this problem. Therefore, special techniques and methods have been proposed to solve this problem. On the other hand, in order to intensify sanctions on foreign delaying projects, timely completion of projects has been accelerated. Therefore, attention to project ROBUSTNESS subject to project managements. In this article, a real issue is scheduled for a robust scheduling model of a refinery project. Since project scheduling has resource constraints such NP-Hard problems, SIMULATED ANNEALING ALGORITHM was proposed to solve this problem. In order to validate the model, 4 problems with small size were chosen and the solutions obtained by the proposed algorithms were compared with the exact solution obtained by Lingo8 software. The results showed that the proposed algorithm is efficient and convergent to the optimal solution.

Cites

  • No record.
  • References

  • No record.
  • Cite

    APA: Copy

    HASANPUR, HOSSEINALI, NORNG, AHMAD, & NABIZADEH, MOHAMMAD HOSSEIN. (2014). ROBUST PROJECT SCHEDULING MODEL WITH RESOURCES CONSTRAINT AND SOLVING IT BY SIMULATED ANNEALING ALGORITHM (PART OF THE PROJECT ACTIVITIES OF GAS CONDENSATE REFINERY IN BANDAR ABBAS). MANAGEMENT RESEARCH IN IRAN (MODARES HUMAN SCIENCES), 18(1), 1-24. SID. https://sid.ir/paper/395237/en

    Vancouver: Copy

    HASANPUR HOSSEINALI, NORNG AHMAD, NABIZADEH MOHAMMAD HOSSEIN. ROBUST PROJECT SCHEDULING MODEL WITH RESOURCES CONSTRAINT AND SOLVING IT BY SIMULATED ANNEALING ALGORITHM (PART OF THE PROJECT ACTIVITIES OF GAS CONDENSATE REFINERY IN BANDAR ABBAS). MANAGEMENT RESEARCH IN IRAN (MODARES HUMAN SCIENCES)[Internet]. 2014;18(1):1-24. Available from: https://sid.ir/paper/395237/en

    IEEE: Copy

    HOSSEINALI HASANPUR, AHMAD NORNG, and MOHAMMAD HOSSEIN NABIZADEH, “ROBUST PROJECT SCHEDULING MODEL WITH RESOURCES CONSTRAINT AND SOLVING IT BY SIMULATED ANNEALING ALGORITHM (PART OF THE PROJECT ACTIVITIES OF GAS CONDENSATE REFINERY IN BANDAR ABBAS),” MANAGEMENT RESEARCH IN IRAN (MODARES HUMAN SCIENCES), vol. 18, no. 1, pp. 1–24, 2014, [Online]. Available: https://sid.ir/paper/395237/en

    Related Journal Papers

    Related Seminar Papers

  • No record.
  • Related Plans

  • No record.
  • Recommended Workshops






    Move to top
    telegram sharing button
    whatsapp sharing button
    linkedin sharing button
    twitter sharing button
    email sharing button
    email sharing button
    email sharing button
    sharethis sharing button