مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Journal Paper

Paper Information

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Verion

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

video

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

sound

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Version

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

View:

694
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Download:

0
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Cites:

Information Journal Paper

Title

ASSESSING PROJECT TIME MANAGEMENT OF THE MORVARID PETROCHEMICAL CONTRACTORS IN 5TH OLEFIN PROJECT VIA ANP

Pages

  39-53

Abstract

 Project management is the application of knowledge, skills, tools, and techniques to project activities in order to meet or exceed sponsors’ needs and expectations. Project TIME MANAGEMENT is one of the fields that involve processes which require success in order to complete projects on time; accordingly, these processes are affected by other factors. This study tries to introduce some assessment models in project management in Morvarid Petrochemical Co., as the executive of the 5th Olefin project in Asalouyeh, and their contractors. Effective factors in TIME MANAGEMENT and delays could be affected by Morvarid petrochemical contractors; accordingly similar contract types are made (Fixed Price Construction & Erection Contract: Lump Sum). These factors are categorized based on management fields in PMBOK standard and assessed with ANP and questionnaires. Contractors could be ranked via comparing their strengths and weaknesses. Their factors are the different weight value in delays. The findings of this research show that the entire management project fields have relation with each other but the intensity of their relations differs and depends on time and place of project execution.

Cites

  • No record.
  • References

  • No record.
  • Cite

    APA: Copy

    KESHVARI, ADNAN, SOUKHAKIAN, MOHAMMAD ALI, & NIKZAD MANTEGHI, ALI. (2011). ASSESSING PROJECT TIME MANAGEMENT OF THE MORVARID PETROCHEMICAL CONTRACTORS IN 5TH OLEFIN PROJECT VIA ANP. JOURNAL OF INDUSTRIAL MANAGEMENT, 6(16), 39-53. SID. https://sid.ir/paper/171157/en

    Vancouver: Copy

    KESHVARI ADNAN, SOUKHAKIAN MOHAMMAD ALI, NIKZAD MANTEGHI ALI. ASSESSING PROJECT TIME MANAGEMENT OF THE MORVARID PETROCHEMICAL CONTRACTORS IN 5TH OLEFIN PROJECT VIA ANP. JOURNAL OF INDUSTRIAL MANAGEMENT[Internet]. 2011;6(16):39-53. Available from: https://sid.ir/paper/171157/en

    IEEE: Copy

    ADNAN KESHVARI, MOHAMMAD ALI SOUKHAKIAN, and ALI NIKZAD MANTEGHI, “ASSESSING PROJECT TIME MANAGEMENT OF THE MORVARID PETROCHEMICAL CONTRACTORS IN 5TH OLEFIN PROJECT VIA ANP,” JOURNAL OF INDUSTRIAL MANAGEMENT, vol. 6, no. 16, pp. 39–53, 2011, [Online]. Available: https://sid.ir/paper/171157/en

    Related Journal Papers

    Related Seminar Papers

  • No record.
  • Related Plans

  • No record.
  • Recommended Workshops






    Move to top
    telegram sharing button
    whatsapp sharing button
    linkedin sharing button
    twitter sharing button
    email sharing button
    email sharing button
    email sharing button
    sharethis sharing button