Information Journal Paper
APA:
CopyFarughi, Hiwa, ALANIAZAR, SEIRAN, MOUSAVIPOUR, SEYEDHAMED, & MORADI, VAHED. (2017). A PRACTICAL FRAMEWORK BASED ON FUZZY FMEA TO DIAGNOSE CAUSES OF DELAY IN CONSTRUCTION PROJECTS. JOURNAL OF INDUSTRIAL MANAGEMENT STUDIES, 15(45 ), 145-175. SID. https://sid.ir/paper/213275/en
Vancouver:
CopyFarughi Hiwa, ALANIAZAR SEIRAN, MOUSAVIPOUR SEYEDHAMED, MORADI VAHED. A PRACTICAL FRAMEWORK BASED ON FUZZY FMEA TO DIAGNOSE CAUSES OF DELAY IN CONSTRUCTION PROJECTS. JOURNAL OF INDUSTRIAL MANAGEMENT STUDIES[Internet]. 2017;15(45 ):145-175. Available from: https://sid.ir/paper/213275/en
IEEE:
CopyHiwa Farughi, SEIRAN ALANIAZAR, SEYEDHAMED MOUSAVIPOUR, and VAHED MORADI, “A PRACTICAL FRAMEWORK BASED ON FUZZY FMEA TO DIAGNOSE CAUSES OF DELAY IN CONSTRUCTION PROJECTS,” JOURNAL OF INDUSTRIAL MANAGEMENT STUDIES, vol. 15, no. 45 , pp. 145–175, 2017, [Online]. Available: https://sid.ir/paper/213275/en