Information Journal Paper
APA:
CopyATIGHEHCHIAN, AREZOO. (2016). STEELMAKING-CONTINUOUS CASTING SCHEDULING USING A HYBRID META-HEURISTIC CASE STUDY: KHOOZESTAN STEEL COMPLEX. PRODUCTION AND OPERATIONS MANAGEMENT, 7(1 (12) ), 137-153. SID. https://sid.ir/paper/217539/en
Vancouver:
CopyATIGHEHCHIAN AREZOO. STEELMAKING-CONTINUOUS CASTING SCHEDULING USING A HYBRID META-HEURISTIC CASE STUDY: KHOOZESTAN STEEL COMPLEX. PRODUCTION AND OPERATIONS MANAGEMENT[Internet]. 2016;7(1 (12) ):137-153. Available from: https://sid.ir/paper/217539/en
IEEE:
CopyAREZOO ATIGHEHCHIAN, “STEELMAKING-CONTINUOUS CASTING SCHEDULING USING A HYBRID META-HEURISTIC CASE STUDY: KHOOZESTAN STEEL COMPLEX,” PRODUCTION AND OPERATIONS MANAGEMENT, vol. 7, no. 1 (12) , pp. 137–153, 2016, [Online]. Available: https://sid.ir/paper/217539/en