مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Verion

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

video

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

sound

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Version

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

View:

2,165
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Download:

0
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Cites:

Information Journal Paper

Title

ECONOMIC ASSESSMENT OF THE CONSTRUCTION OF HYDROELECTRIC POWER PLANT (PUMPED-STORAGE) IN IRANIAN RESERVOIR DAMS: CASE STUDY OF PIRTAGHI DAMANDPOWER PLANT

Pages

  199-224

Abstract

 Nowadays, the optimal and cost effective design and operation in power industry has always been of interest and in development and operation of the power industry, economic distribution of the load among fossil fuel power plants and minimizing operation cost are considered among main goals. One of the issues considered in load economic distribution is coordination between plants. Pump – storage power plants are of the type of HYDROELECTRIC POWER PLANTs with motor function transfer energy from low-consumption hours to high-consumption hours. As a result, unusable and produced electric power surplus in off-peak hours is converted to potential energy.This study has economically examined the construction of PUMPED-STORAGE POWER PLANT next to the Pir-Taghi reservoir DAM using the measures of engineering economics in 2014.Forthispurpose, the four scenarios of reservoir capacity of 1.5,2, 3and4million cubic meters were used. Results indicated that the best case is the reservoir capacity of 3million cubic meters. The value of net present value of the project has varied in various cases from the minimum of 2217 billion Rials in the case of 1.5 million cubic meters up to 3750 billion Rials in the case of 3 million cubic meters. The value of this index is a proper criterion for selecting the preferred case among economic options. The values of finished expenseper kilowhat of generated electricity vary from a minimum of 4248 Rials in the case of 2 million cubic meters up to 4302 Rials in the case of 4 million cubic meters.In addition, the results of sensitivity analysis of the economic parameters to changes in the interest rate show that although by increasing interest rate the value of economic parameters is decreased, but the reservoir capacity of 3 million cubic meters has still economic justification. The results of sensitivity analysis of the economic parameters to the cost of the environment pollutants indicate that the elimination of the costs of the environment pollutants or increase them by 50% and 100% in each of the sites will not have a significant impact on their economic indicators.

Cites

  • No record.
  • References

  • No record.
  • Cite

    APA: Copy

    KHODAPARAST MASHHADI, MAHDI, & GHEZELBASH, AZAM. (2016). ECONOMIC ASSESSMENT OF THE CONSTRUCTION OF HYDROELECTRIC POWER PLANT (PUMPED-STORAGE) IN IRANIAN RESERVOIR DAMS: CASE STUDY OF PIRTAGHI DAMANDPOWER PLANT. JOURNAL OF APPLIED ECONOMICS STUDIES IN IRAN, 5(17 ), 199-224. SID. https://sid.ir/paper/226520/en

    Vancouver: Copy

    KHODAPARAST MASHHADI MAHDI, GHEZELBASH AZAM. ECONOMIC ASSESSMENT OF THE CONSTRUCTION OF HYDROELECTRIC POWER PLANT (PUMPED-STORAGE) IN IRANIAN RESERVOIR DAMS: CASE STUDY OF PIRTAGHI DAMANDPOWER PLANT. JOURNAL OF APPLIED ECONOMICS STUDIES IN IRAN[Internet]. 2016;5(17 ):199-224. Available from: https://sid.ir/paper/226520/en

    IEEE: Copy

    MAHDI KHODAPARAST MASHHADI, and AZAM GHEZELBASH, “ECONOMIC ASSESSMENT OF THE CONSTRUCTION OF HYDROELECTRIC POWER PLANT (PUMPED-STORAGE) IN IRANIAN RESERVOIR DAMS: CASE STUDY OF PIRTAGHI DAMANDPOWER PLANT,” JOURNAL OF APPLIED ECONOMICS STUDIES IN IRAN, vol. 5, no. 17 , pp. 199–224, 2016, [Online]. Available: https://sid.ir/paper/226520/en

    Related Journal Papers

    Related Seminar Papers

  • No record.
  • Related Plans

  • No record.
  • Recommended Workshops






    Move to top
    telegram sharing button
    whatsapp sharing button
    linkedin sharing button
    twitter sharing button
    email sharing button
    email sharing button
    email sharing button
    sharethis sharing button