مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

video

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

sound

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Version

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

View:

185
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Download:

377
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Cites:

Information Journal Paper

Title

A multi-objective resource-constrained project scheduling problem with time lags and fuzzy activity durations

Pages

  45-71

Abstract

 The resource-constrained project scheduling problem is to find a schedule that minimizes the project duration subject to precedence relations and resource constraints. To further account for economic aspects of the project, one may add an objective of cash nature to the problem. In addition, dynamic nature and variations in real world are known to introduce uncertainties into data. Therefore, this study is aimed at proposing a multi-objective model for resource-constrained project scheduling problem, with the model objectives being to minimize makespan, and maximize net present value of the project cash flows; the proposed model has activity times expressed in fuzzy numbers where the corresponding uncertainties are taken into account. The project environment is considered to be a multi-resource environment where more than one resource is needed for the execution of any activity. Also, the proposed model comes with time lags in precedence relations between activities. The proposed model is validated by using epsilon-constraint method. The α-cut approach as well as the expression of acceptable risk level by the project manager is used to defuzzificate fuzzy activity durations. Since the problem is NP-hard, a NSGA-II meta-heuristic algorithm is proposed to solve the problem. The algorithm performance has been evaluated in terms of different criteria.

Multimedia

  • No record.
  • Cites

  • No record.
  • References

  • No record.
  • Cite

    APA: Copy

    EYDI, ALIREZA, & BAKHSHI, MOHSEN. (2019). A multi-objective resource-constrained project scheduling problem with time lags and fuzzy activity durations. JOURNAL OF INDUSTRIAL AND SYSTEMS ENGINEERING (JISE), 12(Special issue on Project Management and Control), 45-71. SID. https://sid.ir/paper/307198/en

    Vancouver: Copy

    EYDI ALIREZA, BAKHSHI MOHSEN. A multi-objective resource-constrained project scheduling problem with time lags and fuzzy activity durations. JOURNAL OF INDUSTRIAL AND SYSTEMS ENGINEERING (JISE)[Internet]. 2019;12(Special issue on Project Management and Control):45-71. Available from: https://sid.ir/paper/307198/en

    IEEE: Copy

    ALIREZA EYDI, and MOHSEN BAKHSHI, “A multi-objective resource-constrained project scheduling problem with time lags and fuzzy activity durations,” JOURNAL OF INDUSTRIAL AND SYSTEMS ENGINEERING (JISE), vol. 12, no. Special issue on Project Management and Control, pp. 45–71, 2019, [Online]. Available: https://sid.ir/paper/307198/en

    Related Journal Papers

  • No record.
  • Related Seminar Papers

  • No record.
  • Related Plans

  • No record.
  • Recommended Workshops






    Move to top
    telegram sharing button
    whatsapp sharing button
    linkedin sharing button
    twitter sharing button
    email sharing button
    email sharing button
    email sharing button
    sharethis sharing button