Information Journal Paper
APA:
CopySALMASI, N., & LOGENDRAN, R.. (2008). A HEURISTIC APPROACH FOR MULTI-STAGE SEQUENCE-DEPENDENT GROUP SCHEDULING PROBLEMS. JOURNAL OF INDUSTRIAL ENGINEERING INTERNATIONAL, 4(7), 48-58. SID. https://sid.ir/paper/309777/en
Vancouver:
CopySALMASI N., LOGENDRAN R.. A HEURISTIC APPROACH FOR MULTI-STAGE SEQUENCE-DEPENDENT GROUP SCHEDULING PROBLEMS. JOURNAL OF INDUSTRIAL ENGINEERING INTERNATIONAL[Internet]. 2008;4(7):48-58. Available from: https://sid.ir/paper/309777/en
IEEE:
CopyN. SALMASI, and R. LOGENDRAN, “A HEURISTIC APPROACH FOR MULTI-STAGE SEQUENCE-DEPENDENT GROUP SCHEDULING PROBLEMS,” JOURNAL OF INDUSTRIAL ENGINEERING INTERNATIONAL, vol. 4, no. 7, pp. 48–58, 2008, [Online]. Available: https://sid.ir/paper/309777/en