Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

video

Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

sound

Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Version

Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

View:

543
Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Download:

490
Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Cites:

Information Journal Paper

Title

ENVIRONMENTAL RISK ASSESSMENT OF A DAM DURING CONSTRUCTION PHASE

Pages

  345-356

Keywords

PRELIMINARY HAZARD ANALYSIS (PHA) 
TECHNIQUE FOR ORDER OF PREFERENCE BY SIMILARITY TO IDEAL SOLUTION (TOPSIS) 

Abstract

 The present study was conducted to assess the possible RISKs induced by construction of GAVI DAM in Ilam Province, western part of Iran, using MIKE-11 model and technique for order of preference by similarity to ideal solution. For this purpose, vulnerable zone of the dam site against the flooding RISK of Gavi River was calculated for different return periods. The flooding zones were stimulated by MIKE-11 model. In order to check whether or not the dam construction could affect the quality of the Gavi River, the physicochemical quality of the river water was also tested. Afterwards, a questionnaire was prepared containing an inventory of possible RISKs supposed to be induced by construction of GAVI DAM. The questionnaires were placed at disposal of experts to score the items based on their importance. The questionnaires were then analyzed using SPSS Software, version 16. According to which, a total number of 12 RISK factors were identified. The dam construction RISKs were qualitatively assessed by preliminary hazard analysis. Based on the results, 3 of 12 identified RISKs were recognized unacceptable. The shortlisted RISKs were prioritized at final step using technique for order of preference by similarity to ideal solution. “Habitat fragmentation” with a weight of 0.3002, “water pollution” with a weight of 0.295, and “impacts on aquatics” with a weight of 0.293 were identified as three top priority flooding RISKs. Among the most important corrective measures for mitigation of the RISKs at CONSTRUCTION PHASE can be pointed to “restoration of the land cover”, “conservation of areas surrounding the dam as a new wildlife habitat”, “prevention of water contamination”, and “conservation of fish spawning sites”.

Cites

  • No record.
  • References

  • No record.
  • Cite

    APA: Copy

    REZAIAN, S., JOZI, S.A., & ZAREDAR, N.. (2016). ENVIRONMENTAL RISK ASSESSMENT OF A DAM DURING CONSTRUCTION PHASE. GLOBAL JOURNAL OF ENVIRONMENTAL SCIENCE AND MANAGEMENT, 2(4), 345-356. SID. https://sid.ir/paper/343428/en

    Vancouver: Copy

    REZAIAN S., JOZI S.A., ZAREDAR N.. ENVIRONMENTAL RISK ASSESSMENT OF A DAM DURING CONSTRUCTION PHASE. GLOBAL JOURNAL OF ENVIRONMENTAL SCIENCE AND MANAGEMENT[Internet]. 2016;2(4):345-356. Available from: https://sid.ir/paper/343428/en

    IEEE: Copy

    S. REZAIAN, S.A. JOZI, and N. ZAREDAR, “ENVIRONMENTAL RISK ASSESSMENT OF A DAM DURING CONSTRUCTION PHASE,” GLOBAL JOURNAL OF ENVIRONMENTAL SCIENCE AND MANAGEMENT, vol. 2, no. 4, pp. 345–356, 2016, [Online]. Available: https://sid.ir/paper/343428/en

    Related Journal Papers

  • No record.
  • Related Seminar Papers

  • No record.
  • Related Plans

  • No record.
  • Recommended Workshops






    Move to top