مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Verion

Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

video

Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

sound

Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Version

Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

View:

1,706
Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Download:

0
Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Cites:

Information Journal Paper

Title

PREVENTIVE MAINTENANCE SCHEDULING WITH MULTI SKILLED WORKFORCE

Pages

  47-69

Abstract

 The purpose of PREVENTIVE MAINTENANCe management is to perform a series of tasks that prevents or minimizes production breakdowns and improves the reliability of production facilities. The inspection, repair, and replacement of production equipment are tasks that are central to PREVENTIVE MAINTENANCe management.An important objective of PREVENTIVE MAINTENANCe management is to minimize the downtime of production facilities. In order to accomplish this objective, management personnel has to efficiently allocate resources and determine an effective maintenance schedule. Mathematical models have been developed to solve the PREVENTIVE MAINTENANCe-scheduling problem of assigning skilled personnel to work with tasks that require a set of corresponding skills.However, there are several limitations in the prior work in this area of research. The craft-combination problem has not been solved because the craft-combinations is assumed to be given. The craft-combination problem concerns the computation of all combinations of assigning multi-skilled workers to accomplishing a particular task. In fact, determining craft-combinations is difficult because of the exponential number of craft-combinations that are possible.This research provides an integrated solution for the PREVENTIVE MAINTENANCe-scheduling problem with MULTI-SKILLED WORKFORCE constraints.Two novel PREVENTIVE MAINTENANCe-scheduling model is formulated to automatically produce the optimal solution and craft combination.

Cites

  • No record.
  • References

  • No record.
  • Cite

    APA: Copy

    JAFARNAJAD, AHMAD, & ESMAELIAN, MAJID. (2011). PREVENTIVE MAINTENANCE SCHEDULING WITH MULTI SKILLED WORKFORCE. MANAGEMENT RESEARCH IN IRAN (MODARES HUMAN SCIENCES), 15(2 (71)), 47-69. SID. https://sid.ir/paper/361951/en

    Vancouver: Copy

    JAFARNAJAD AHMAD, ESMAELIAN MAJID. PREVENTIVE MAINTENANCE SCHEDULING WITH MULTI SKILLED WORKFORCE. MANAGEMENT RESEARCH IN IRAN (MODARES HUMAN SCIENCES)[Internet]. 2011;15(2 (71)):47-69. Available from: https://sid.ir/paper/361951/en

    IEEE: Copy

    AHMAD JAFARNAJAD, and MAJID ESMAELIAN, “PREVENTIVE MAINTENANCE SCHEDULING WITH MULTI SKILLED WORKFORCE,” MANAGEMENT RESEARCH IN IRAN (MODARES HUMAN SCIENCES), vol. 15, no. 2 (71), pp. 47–69, 2011, [Online]. Available: https://sid.ir/paper/361951/en

    Related Journal Papers

    Related Seminar Papers

  • No record.
  • Related Plans

  • No record.
  • Recommended Workshops






    Move to top