مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Verion

Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

video

Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

sound

Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Version

Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

View:

397
Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Download:

0
Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Cites:

Information Journal Paper

Title

A Comparison of Optimal Production of NIOC under Neutral State and IOC's Optimal Production Profile under IPC Limitations by Emphasizing on EOR/IOR Methods-Dorood Oil Field Development Case Study

Pages

  33-66

Abstract

 Optimum depletion of oil reservoirs has been emphasized many times by Iranian supreme laws. To promote the effectiveness of the older version of Iranian Petroleum Contract (Buyback), Islamic Republic of Iran's Petroleum Ministry is allowed by law to design a new type of petroleum contract. Recently, new contract, so called IPC, is unveiled. Dorood Oil Field is one of the field which has been developed under Buyback contract. Many experts believe that, in this case, Buyback could not fulfill field's optimum production targets planned by NIOC. According to this claims and to evaluate how effective is IPC regarding to fulfilling optimum production, here, we tried to compare optimum production in neutral state (NIOC view) and what is expected to come out under IPC Contractual limitations (IOC view). In the first step, Optimum Production Paths were modeled and calculated using Dynamic Optimization Method under three different scenarios (reference, attractive and strict) and later data were analyzed. Results clearly show IPC's distortionary effect which means there is separation between NIOC and IOC's optimal production paths. So as a result, under IPC limitations contractor could not meet the production profile which NIOC targeted. IPC could not motivate the contractor to use EOR method in the field to promote the production as well. In all scenarios, contractor prefer to choose no injection or injection of a limited level of fluid into the reservoir as the optimum scenario.

Cites

  • No record.
  • References

  • No record.
  • Cite

    APA: Copy

    MAHMOUDI, VAHID, EBRAHIMI, SEYED NASROLLAH, & GHASEMI, SADEGH. (2020). A Comparison of Optimal Production of NIOC under Neutral State and IOC's Optimal Production Profile under IPC Limitations by Emphasizing on EOR/IOR Methods-Dorood Oil Field Development Case Study. JOURNAL OF ENERGY PLANNING AND POLICY RESEARCH, 5(17 ), 33-66. SID. https://sid.ir/paper/369344/en

    Vancouver: Copy

    MAHMOUDI VAHID, EBRAHIMI SEYED NASROLLAH, GHASEMI SADEGH. A Comparison of Optimal Production of NIOC under Neutral State and IOC's Optimal Production Profile under IPC Limitations by Emphasizing on EOR/IOR Methods-Dorood Oil Field Development Case Study. JOURNAL OF ENERGY PLANNING AND POLICY RESEARCH[Internet]. 2020;5(17 ):33-66. Available from: https://sid.ir/paper/369344/en

    IEEE: Copy

    VAHID MAHMOUDI, SEYED NASROLLAH EBRAHIMI, and SADEGH GHASEMI, “A Comparison of Optimal Production of NIOC under Neutral State and IOC's Optimal Production Profile under IPC Limitations by Emphasizing on EOR/IOR Methods-Dorood Oil Field Development Case Study,” JOURNAL OF ENERGY PLANNING AND POLICY RESEARCH, vol. 5, no. 17 , pp. 33–66, 2020, [Online]. Available: https://sid.ir/paper/369344/en

    Related Journal Papers

    Related Seminar Papers

  • No record.
  • Related Plans

  • No record.
  • Recommended Workshops






    Move to top