Information Journal Paper
APA:
CopyKhodabandeh, Mahdi, Hejazi Taghanaki, Seyed Reza, & RASTI BARZOKI, MORTEZA. (2018). A Heuristic Method to Minimize Total Weighted Number of Tardy Jobs and Transportation Costs for an Integrated Production and Distribution Problem with VRP. MODERN RESEARCHES IN DECISION MAKING, 3(3 ), 55-78. SID. https://sid.ir/paper/372004/en
Vancouver:
CopyKhodabandeh Mahdi, Hejazi Taghanaki Seyed Reza, RASTI BARZOKI MORTEZA. A Heuristic Method to Minimize Total Weighted Number of Tardy Jobs and Transportation Costs for an Integrated Production and Distribution Problem with VRP. MODERN RESEARCHES IN DECISION MAKING[Internet]. 2018;3(3 ):55-78. Available from: https://sid.ir/paper/372004/en
IEEE:
CopyMahdi Khodabandeh, Seyed Reza Hejazi Taghanaki, and MORTEZA RASTI BARZOKI, “A Heuristic Method to Minimize Total Weighted Number of Tardy Jobs and Transportation Costs for an Integrated Production and Distribution Problem with VRP,” MODERN RESEARCHES IN DECISION MAKING, vol. 3, no. 3 , pp. 55–78, 2018, [Online]. Available: https://sid.ir/paper/372004/en