Information Journal Paper
APA:
CopyEL RAYES, K., & KANDIL, A.. (2005). TIME-COST-QUALITY TRADE-OFF ANALYSIS FOR HIGHWAY CONSTRUCTION
. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT (ASCE), 131(4), 477-485. SID. https://sid.ir/paper/542357/en
Vancouver:
CopyEL RAYES K., KANDIL A.. TIME-COST-QUALITY TRADE-OFF ANALYSIS FOR HIGHWAY CONSTRUCTION
. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT (ASCE)[Internet]. 2005;131(4):477-485. Available from: https://sid.ir/paper/542357/en
IEEE:
CopyK. EL RAYES, and A. KANDIL, “TIME-COST-QUALITY TRADE-OFF ANALYSIS FOR HIGHWAY CONSTRUCTION
,” JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT (ASCE), vol. 131, no. 4, pp. 477–485, 2005, [Online]. Available: https://sid.ir/paper/542357/en