Information Journal Paper
APA:
CopyGUPTA, D., SHARMA, S., & BALA, S.. (2012). OPTIMAL TWO STAGES SPECIALLY STRUCTURED FLOW SHOP SCHEDULING: MINIMIZE THE RENTAL COST WITH INDEPENDENT SETUP TIME. INTERNATIONAL JOURNAL OF APPLIED OPERATIONAL RESEARCH, 2(3), 31-41. SID. https://sid.ir/paper/600449/en
Vancouver:
CopyGUPTA D., SHARMA S., BALA S.. OPTIMAL TWO STAGES SPECIALLY STRUCTURED FLOW SHOP SCHEDULING: MINIMIZE THE RENTAL COST WITH INDEPENDENT SETUP TIME. INTERNATIONAL JOURNAL OF APPLIED OPERATIONAL RESEARCH[Internet]. 2012;2(3):31-41. Available from: https://sid.ir/paper/600449/en
IEEE:
CopyD. GUPTA, S. SHARMA, and S. BALA, “OPTIMAL TWO STAGES SPECIALLY STRUCTURED FLOW SHOP SCHEDULING: MINIMIZE THE RENTAL COST WITH INDEPENDENT SETUP TIME,” INTERNATIONAL JOURNAL OF APPLIED OPERATIONAL RESEARCH, vol. 2, no. 3, pp. 31–41, 2012, [Online]. Available: https://sid.ir/paper/600449/en