Information Journal Paper
APA:
CopyTSAI, C.H., & LI, R.K.. (2000). A DUE-DATE ORIENTED SCHEDULING HEURISTIC FOR JOB SHOP CELLULAR MANUFACTURING SYSTEM. INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING: THEORY APPLICATIONS AND PRACTICE, 7(1), 76-88. SID. https://sid.ir/paper/628120/en
Vancouver:
CopyTSAI C.H., LI R.K.. A DUE-DATE ORIENTED SCHEDULING HEURISTIC FOR JOB SHOP CELLULAR MANUFACTURING SYSTEM. INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING: THEORY APPLICATIONS AND PRACTICE[Internet]. 2000;7(1):76-88. Available from: https://sid.ir/paper/628120/en
IEEE:
CopyC.H. TSAI, and R.K. LI, “A DUE-DATE ORIENTED SCHEDULING HEURISTIC FOR JOB SHOP CELLULAR MANUFACTURING SYSTEM,” INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING: THEORY APPLICATIONS AND PRACTICE, vol. 7, no. 1, pp. 76–88, 2000, [Online]. Available: https://sid.ir/paper/628120/en