Information Journal Paper
APA:
CopyARSHADI KHAMSEH, ALIREZA, & DOOST MOHAMADI, MOHAMMAD. (2014). COMPLETE / INCOMPLETE HIERARCHICAL HUB CENTER SINGLE ASSIGNMENT NETWORK PROBLEM. JOURNAL OF OPTIMIZATION IN INDUSTRIAL ENGINEERING (JOURNAL OF INDUSTRIAL ENGINEERING), 8(1 (14)), 1-12. SID. https://sid.ir/paper/629355/en
Vancouver:
CopyARSHADI KHAMSEH ALIREZA, DOOST MOHAMADI MOHAMMAD. COMPLETE / INCOMPLETE HIERARCHICAL HUB CENTER SINGLE ASSIGNMENT NETWORK PROBLEM. JOURNAL OF OPTIMIZATION IN INDUSTRIAL ENGINEERING (JOURNAL OF INDUSTRIAL ENGINEERING)[Internet]. 2014;8(1 (14)):1-12. Available from: https://sid.ir/paper/629355/en
IEEE:
CopyALIREZA ARSHADI KHAMSEH, and MOHAMMAD DOOST MOHAMADI, “COMPLETE / INCOMPLETE HIERARCHICAL HUB CENTER SINGLE ASSIGNMENT NETWORK PROBLEM,” JOURNAL OF OPTIMIZATION IN INDUSTRIAL ENGINEERING (JOURNAL OF INDUSTRIAL ENGINEERING), vol. 8, no. 1 (14), pp. 1–12, 2014, [Online]. Available: https://sid.ir/paper/629355/en