Information Journal Paper
APA:
CopyCOHEN, I., GOLANY, B., & SHTUB, A.. (2007). RESOURCE ALLOCATION IN STOCHASTIC, FINITE-CAPACITY, MULTIPROJECT SYSTEMS THROUGH THE CROSS ENTROPY METHODOLOGY. JOURNAL OF SCHEDULING, 10(-), 181-193. SID. https://sid.ir/paper/657655/en
Vancouver:
CopyCOHEN I., GOLANY B., SHTUB A.. RESOURCE ALLOCATION IN STOCHASTIC, FINITE-CAPACITY, MULTIPROJECT SYSTEMS THROUGH THE CROSS ENTROPY METHODOLOGY. JOURNAL OF SCHEDULING[Internet]. 2007;10(-):181-193. Available from: https://sid.ir/paper/657655/en
IEEE:
CopyI. COHEN, B. GOLANY, and A. SHTUB, “RESOURCE ALLOCATION IN STOCHASTIC, FINITE-CAPACITY, MULTIPROJECT SYSTEMS THROUGH THE CROSS ENTROPY METHODOLOGY,” JOURNAL OF SCHEDULING, vol. 10, no. -, pp. 181–193, 2007, [Online]. Available: https://sid.ir/paper/657655/en