Information Journal Paper
APA:
CopyBEHROOZI, MAHDI, & ESHGHI, KOUROSH. (2011). MODELING AND SOLVING JOB SHOP SCHEDULING PROBLEM WITH SEQUENCE DEPENDENT SETUP TIMES. INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING AND PRODUCTION MANAGEMENT (IJIE) (INTERNATIONAL JOURNAL OF ENGINEERING SCIENCE) (PERSIAN), 21(4), 102-115. SID. https://sid.ir/paper/65828/en
Vancouver:
CopyBEHROOZI MAHDI, ESHGHI KOUROSH. MODELING AND SOLVING JOB SHOP SCHEDULING PROBLEM WITH SEQUENCE DEPENDENT SETUP TIMES. INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING AND PRODUCTION MANAGEMENT (IJIE) (INTERNATIONAL JOURNAL OF ENGINEERING SCIENCE) (PERSIAN)[Internet]. 2011;21(4):102-115. Available from: https://sid.ir/paper/65828/en
IEEE:
CopyMAHDI BEHROOZI, and KOUROSH ESHGHI, “MODELING AND SOLVING JOB SHOP SCHEDULING PROBLEM WITH SEQUENCE DEPENDENT SETUP TIMES,” INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING AND PRODUCTION MANAGEMENT (IJIE) (INTERNATIONAL JOURNAL OF ENGINEERING SCIENCE) (PERSIAN), vol. 21, no. 4, pp. 102–115, 2011, [Online]. Available: https://sid.ir/paper/65828/en