مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Verion

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

video

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

sound

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Version

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

View:

1,706
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Download:

0
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Cites:

Information Journal Paper

Title

MODELING AND SOLVING JOB SHOP SCHEDULING PROBLEM WITH SEQUENCE DEPENDENT SETUP TIMES

Pages

  102-115

Keywords

PARTICLE SWARM OPTIMIZATION (PSO)Q2
SIMULATED ANNEALING (SA)Q3

Abstract

 In recent decade, many researches has been done on JOB SHOP SCHEDULING problem with sequence dependent setup times (SDSJSP), but with respect to the knowledge of authors in very few of them the assumption of existing inseparable setup has been considered. Also, in attracted metaheuristic algorithms to this problem the Particle Swarm Optimization has not been considered. In this paper, the ISDSJSP with makespan minimization is considered. For this problem an MILP model has been developed and a PSO algorithm has been applied to solve it. In order to improve final solution obtained by PSO a simulated annealing algorithm has been applied. The proposed hybrid algorithm (HPSO) has been applied on some generated benchmark problems and the results indicate the effectiveness and efficiency of the proposed hybrid PSO with respect to two other algorithms.

Multimedia

  • No record.
  • Cites

  • No record.
  • References

  • No record.
  • Cite

    APA: Copy

    BEHROOZI, MAHDI, & ESHGHI, KOUROSH. (2011). MODELING AND SOLVING JOB SHOP SCHEDULING PROBLEM WITH SEQUENCE DEPENDENT SETUP TIMES. INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING AND PRODUCTION MANAGEMENT (IJIE) (INTERNATIONAL JOURNAL OF ENGINEERING SCIENCE) (PERSIAN), 21(4), 102-115. SID. https://sid.ir/paper/65828/en

    Vancouver: Copy

    BEHROOZI MAHDI, ESHGHI KOUROSH. MODELING AND SOLVING JOB SHOP SCHEDULING PROBLEM WITH SEQUENCE DEPENDENT SETUP TIMES. INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING AND PRODUCTION MANAGEMENT (IJIE) (INTERNATIONAL JOURNAL OF ENGINEERING SCIENCE) (PERSIAN)[Internet]. 2011;21(4):102-115. Available from: https://sid.ir/paper/65828/en

    IEEE: Copy

    MAHDI BEHROOZI, and KOUROSH ESHGHI, “MODELING AND SOLVING JOB SHOP SCHEDULING PROBLEM WITH SEQUENCE DEPENDENT SETUP TIMES,” INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING AND PRODUCTION MANAGEMENT (IJIE) (INTERNATIONAL JOURNAL OF ENGINEERING SCIENCE) (PERSIAN), vol. 21, no. 4, pp. 102–115, 2011, [Online]. Available: https://sid.ir/paper/65828/en

    Related Journal Papers

    Related Seminar Papers

  • No record.
  • Related Plans

  • No record.
  • Recommended Workshops






    Move to top
    telegram sharing button
    whatsapp sharing button
    linkedin sharing button
    twitter sharing button
    email sharing button
    email sharing button
    email sharing button
    sharethis sharing button