مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Verion

Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

video

Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

sound

Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Version

Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

View:

1,313
Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Download:

0
Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Cites:

Information Journal Paper

Title

THE USE OF SIMULATED ANNEALING AND GENETIC ALGORITHMS FOR A MULTI-MODE RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM WITH DISCOUNTED CASH FLOWS

Pages

  85-91

Keywords

Not Registered.

Abstract

 This paper presents a multi-mode resource-constrained project scheduling problem (MRCPSP) with maximizing the net present value (NPV) form the project contractor’s point of view. Positive and negative cash flows are considered in this model. Furthermore, to make the model close to the real situations, four different models for positive cash flows are considered. Two meta-heuristics, called simulated annealing and genetic algorithms, are used in order to solve the proposed model of the forgoing problem. To schedule all activities, a bi-directional scheduling generation scheme (SGS) for the multi-mode version is proposed, and the activity list structure selects for presenting a permutation of activities. Finally, computational results for a set of test problems taken from the project scheduling problem library (PSPLIB) are presented and discussed.

Cites

  • No record.
  • References

  • No record.
  • Cite

    APA: Copy

    SEYFI, MASOUD, TAVAKOLI MOGHADAM, R., & JOULAEI, F.. (2009). THE USE OF SIMULATED ANNEALING AND GENETIC ALGORITHMS FOR A MULTI-MODE RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM WITH DISCOUNTED CASH FLOWS. INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING AND PRODUCTION MANAGEMENT (IJIE) (INTERNATIONAL JOURNAL OF ENGINEERING SCIENCE) (PERSIAN), 19(4), 85-91. SID. https://sid.ir/paper/65907/en

    Vancouver: Copy

    SEYFI MASOUD, TAVAKOLI MOGHADAM R., JOULAEI F.. THE USE OF SIMULATED ANNEALING AND GENETIC ALGORITHMS FOR A MULTI-MODE RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM WITH DISCOUNTED CASH FLOWS. INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING AND PRODUCTION MANAGEMENT (IJIE) (INTERNATIONAL JOURNAL OF ENGINEERING SCIENCE) (PERSIAN)[Internet]. 2009;19(4):85-91. Available from: https://sid.ir/paper/65907/en

    IEEE: Copy

    MASOUD SEYFI, R. TAVAKOLI MOGHADAM, and F. JOULAEI, “THE USE OF SIMULATED ANNEALING AND GENETIC ALGORITHMS FOR A MULTI-MODE RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM WITH DISCOUNTED CASH FLOWS,” INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING AND PRODUCTION MANAGEMENT (IJIE) (INTERNATIONAL JOURNAL OF ENGINEERING SCIENCE) (PERSIAN), vol. 19, no. 4, pp. 85–91, 2009, [Online]. Available: https://sid.ir/paper/65907/en

    Related Journal Papers

    Related Seminar Papers

  • No record.
  • Related Plans

  • No record.
  • Recommended Workshops






    Move to top