Information Journal Paper
APA:
CopyYE, S.D., & TIONG, R.L.K.. (2000). NPV-ATRISK METHOD IN INFRASTRUCTURE PROJECT INVESTMENT EVALUATION. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT (ASCE), 126(3), 227-233. SID. https://sid.ir/paper/670839/en
Vancouver:
CopyYE S.D., TIONG R.L.K.. NPV-ATRISK METHOD IN INFRASTRUCTURE PROJECT INVESTMENT EVALUATION. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT (ASCE)[Internet]. 2000;126(3):227-233. Available from: https://sid.ir/paper/670839/en
IEEE:
CopyS.D. YE, and R.L.K. TIONG, “NPV-ATRISK METHOD IN INFRASTRUCTURE PROJECT INVESTMENT EVALUATION,” JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT (ASCE), vol. 126, no. 3, pp. 227–233, 2000, [Online]. Available: https://sid.ir/paper/670839/en