مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Verion

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

video

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

sound

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Version

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

View:

477
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Download:

0
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Cites:

Information Journal Paper

Title

Evaluating the Impacts of Implemented Watershed Management Project on Vegetal Cover and Sediment Yield in Kakhk Watershed Project

Pages

  51-63

Abstract

 Background and Objective: This research was carried out to study the impacts of implemented Watershed Management project on vegetal cover and sediment yield in Kakhk Watershed Project. Material and Methodology: In this research in the first stage characteristics of each predicted mechanical operations from detailed studies of Kakhk watershed were recorded. Also, the soil erosion and vegetation condition of area before performancing watershed operation were determined. The characteristics of each Watershed Management structures such as situation, number, volume and its siltation were measured. The biological conservation and efficiency were studied via measuring percent of grass cover, the numbers of live bushes and trees per unit area. The soil erosion was measured by applying MPSIAC model. Consequently, the present and preliminary conditions of watershed (in terms of soil erosion and vegetal cover) were compared with each other and project efficiency was determined. Findings: This reseasch revealed that due to Kakhk implemented Watershed Management project the average vegetation cover and dry forage production increased from 25% and 17 kg to 49% and 89 kg, respectively. The mean efficiency of all mechanical activities is 76 %. The rate of soil erosion decreased from 20 to 10 t ha yr-1. Discussion and Conclusion: The data analysis revealed that after 20 years of project implementation, the vegetation factors improved obviously and the amount of soil erosion has fallen by 50 %.

Cites

  • No record.
  • References

  • No record.
  • Cite

    APA: Copy

    Bagherian Kalat, Ali, Lashkaripour, Gholam Reza, & Gafoori, Mohammad. (2021). Evaluating the Impacts of Implemented Watershed Management Project on Vegetal Cover and Sediment Yield in Kakhk Watershed Project. JOURNAL OF ENVIRONMENTAL SCIENCE AND TECHNOLOGY, 23(7 (110) ), 51-63. SID. https://sid.ir/paper/950074/en

    Vancouver: Copy

    Bagherian Kalat Ali, Lashkaripour Gholam Reza, Gafoori Mohammad. Evaluating the Impacts of Implemented Watershed Management Project on Vegetal Cover and Sediment Yield in Kakhk Watershed Project. JOURNAL OF ENVIRONMENTAL SCIENCE AND TECHNOLOGY[Internet]. 2021;23(7 (110) ):51-63. Available from: https://sid.ir/paper/950074/en

    IEEE: Copy

    Ali Bagherian Kalat, Gholam Reza Lashkaripour, and Mohammad Gafoori, “Evaluating the Impacts of Implemented Watershed Management Project on Vegetal Cover and Sediment Yield in Kakhk Watershed Project,” JOURNAL OF ENVIRONMENTAL SCIENCE AND TECHNOLOGY, vol. 23, no. 7 (110) , pp. 51–63, 2021, [Online]. Available: https://sid.ir/paper/950074/en

    Related Journal Papers

  • No record.
  • Related Seminar Papers

  • No record.
  • Related Plans

  • No record.
  • Recommended Workshops






    Move to top
    telegram sharing button
    whatsapp sharing button
    linkedin sharing button
    twitter sharing button
    email sharing button
    email sharing button
    email sharing button
    sharethis sharing button