مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Verion

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

video

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

sound

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Version

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

View:

1,835
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Download:

0
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Cites:

Information Journal Paper

Title

IDENTIFICATION OF HAZARDOUS AND RISK ASSESSMENT OF TUNNELINGPROCESS USING JSA METHOD IN THE DAM & POWER PLANT SITE

Pages

  103-112

Abstract

 Background: There is no doubt that one of the effective factors in implementation of projects that have potential hazard can cause irreversible losses. Therefore recognizing potential hazards is of paramount importance.Method: The present descriptive-analysis study was conducted at Rudbar Lorestan Dam constructional projects. For recognizing potential hazard in TUNNELING activities, job safety analysis (JSA) was performed according to OSHA 3071 method and for observing this purpose, the RISK ASSESSMENT matrix was carried out on the basis of MIL-STD-882E standard. Combination of severity and probability of each risk makes it possible to determine the risk level and the priority of control measures, qualitatively rating from 1-24.Results: Generally, a total of 232 risk factors were identified in different activities. As results show, %15.9 of recognized risks were serious, %17.3 almost serious, %38.4 medium and %28.4 were in low level. Therefore more than one-third hazards are assessed as unacceptable. Work at heights without using proper lifting, lack of equipment of TUNNELING treatmentolagy, delay in unstable rock mass support can be enumerated as the causative factors.Conclusion: Allocating a percentage of the budget of every construction project to provide safety and rescue equipment as well as experienced safety experts can significantly reduce the risk level. For assessment criteria, MIL-STD-882E standard was used and four indices were presented for decision making: serious, almost serious, medium, and low.

Cites

  • No record.
  • References

  • No record.
  • Cite

    APA: Copy

    BARKHORDARI, A., SHIRAZI, J., & HALVANI, GH.H.. (2012). IDENTIFICATION OF HAZARDOUS AND RISK ASSESSMENT OF TUNNELINGPROCESS USING JSA METHOD IN THE DAM & POWER PLANT SITE. TOLOO-E-BEHDASHT, 11(3 (36)), 103-112. SID. https://sid.ir/paper/102995/en

    Vancouver: Copy

    BARKHORDARI A., SHIRAZI J., HALVANI GH.H.. IDENTIFICATION OF HAZARDOUS AND RISK ASSESSMENT OF TUNNELINGPROCESS USING JSA METHOD IN THE DAM & POWER PLANT SITE. TOLOO-E-BEHDASHT[Internet]. 2012;11(3 (36)):103-112. Available from: https://sid.ir/paper/102995/en

    IEEE: Copy

    A. BARKHORDARI, J. SHIRAZI, and GH.H. HALVANI, “IDENTIFICATION OF HAZARDOUS AND RISK ASSESSMENT OF TUNNELINGPROCESS USING JSA METHOD IN THE DAM & POWER PLANT SITE,” TOLOO-E-BEHDASHT, vol. 11, no. 3 (36), pp. 103–112, 2012, [Online]. Available: https://sid.ir/paper/102995/en

    Related Journal Papers

    Related Seminar Papers

  • No record.
  • Related Plans

  • No record.
  • Recommended Workshops






    Move to top
    telegram sharing button
    whatsapp sharing button
    linkedin sharing button
    twitter sharing button
    email sharing button
    email sharing button
    email sharing button
    sharethis sharing button