مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Verion

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

video

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

sound

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Version

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

View:

1,178
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Download:

0
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Cites:

Information Journal Paper

Title

PROJECT PORTFOLIO MANAGEMENT AND INFORMATION TECHNOLOGY PROJECTS

Pages

  150-161

Abstract

 Introduction: Growing influence of the project as a way to organize things in many organizations require effective MANAGEMENT of multiple projects.. Due to the complexity of IT projects in organizations due to resource constraints especially if you have multiple projects, the necessity and use of project portfolio MANAGEMENT in achieving project objectives in recent years much attention has been. In this research, portfolio MANAGEMENT of IT projects in Isfahan University of Medical Sciences IT Project Portfolio MANAGEMENT at University level, based on a three-step model Bert De Reyck (1 - Inventory Portfolio 2- Portfolio Optimization 3 - Managing portfolio) were investigated.Methods: the present study according to the aim is applied and according to the method of data collection is descriptive - survey Subset of Athletics -. Validity has been confirmed by a number of experts and professors and reliability using Alpha Cronbach coefficient was calculated to 82 Percent. Statistical Society, University ICT All employees that have been done in 1392 AP and to analyze the results of descriptive statistics - mean and standard deviation and - Univariate t-test and a significance level of 0/05 to SPSS 18 software is used.Results: Descriptive analysis of the components of project portfolio MANAGEMENT based on the three organized model Bert De Reyck indicated that the first phase had a mean 2.45±0.81, the second stage has a mean of 2.02±0.69 and The third phase has a mean of 1.87±0.74 respectively. Effects of portfolio MANAGEMENT on the effectiveness indicate that the average effectiveness of projects in each of their indices optimal level and average has been over the 2.75. (P-Value<0.05) And therefore effectiveness is in Positive relation to portfolio MANAGEMENT. The mean level of problems in each of its projects under portfolio MANAGEMENT indicated that average was more than 2.75. (P-Value<0.05) And therefore problems are in negative relation to portfolio MANAGEMENT.Conclusion: University study showed that the level of IT project MANAGEMENT is in the second stage of Bert De Reyck model. Also Under one Project Portfolio MANAGEMENT can add on the effectiveness of projects and finally a review of the problems of portfolio MANAGEMENT project portfolio MANAGEMENT indicated that the level is lower than are added to the institutional project problems.

Cites

  • No record.
  • References

  • No record.
  • Cite

    Related Journal Papers

    Related Seminar Papers

  • No record.
  • Related Plans

  • No record.
  • Recommended Workshops






    Move to top
    telegram sharing button
    whatsapp sharing button
    linkedin sharing button
    twitter sharing button
    email sharing button
    email sharing button
    email sharing button
    sharethis sharing button