Information Journal Paper
APA:
CopyFarughi, Hiwa, Payandeh, Saadi, & ABDI, FARID. (2019). Multi-objective Project Scheduling Considering Discrete Resource Constraints Problem with Multiple Crashable Modes and Mode-identity Capabilities. JOURNAL OF INDUSTRIAL MANAGEMENT, 11(2 ), 351-379. SID. https://sid.ir/paper/139973/en
Vancouver:
CopyFarughi Hiwa, Payandeh Saadi, ABDI FARID. Multi-objective Project Scheduling Considering Discrete Resource Constraints Problem with Multiple Crashable Modes and Mode-identity Capabilities. JOURNAL OF INDUSTRIAL MANAGEMENT[Internet]. 2019;11(2 ):351-379. Available from: https://sid.ir/paper/139973/en
IEEE:
CopyHiwa Farughi, Saadi Payandeh, and FARID ABDI, “Multi-objective Project Scheduling Considering Discrete Resource Constraints Problem with Multiple Crashable Modes and Mode-identity Capabilities,” JOURNAL OF INDUSTRIAL MANAGEMENT, vol. 11, no. 2 , pp. 351–379, 2019, [Online]. Available: https://sid.ir/paper/139973/en