مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Verion

Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

video

Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

sound

Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Version

Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

View:

862
Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Download:

0
Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Cites:

Information Journal Paper

Title

DEVELOPING AND SOLVING A NEW BI-OBJECTIVE MODEL TO ASSIGN HUMAN RESOURCE AND EQUIPMENT TO PARALLEL WORKSTATIONS IN A PRODUCT ION LINE USING OPTIMIZATION VIA SIMULATION TECHNIQUE

Pages

  57-71

Abstract

 In this study, the use of SIMULATION technique in bi-objective OPTIMIZATION of assembly line balancing problem has been studied. The aim of this paper is to determine optimal allocation of human resource and equipment to parallel workstations in order to minimize the cost of adding equipment and manpower among the stations and maximize the production output. In other words, with optimal use of resources, production output is maximized and therefore productivity become maximum. To this end, with OPTIMIZATION via SIMULATION, the production line process is simulated in the form of a SIMULATION model in the ED software. After validating the SIMULATION model using design of experiment, various scenarios designed and run in the SIMULATION model. Possible results for human resource and equipment variables, obtained by GENETIC ALGORITHM are shown in a Pareto chart and have compared with the production line current situation.

Cites

  • No record.
  • References

  • No record.
  • Cite

    APA: Copy

    COMPANY, MOHAMMAD SAEED, & AZIMI, PARHAM. (2017). DEVELOPING AND SOLVING A NEW BI-OBJECTIVE MODEL TO ASSIGN HUMAN RESOURCE AND EQUIPMENT TO PARALLEL WORKSTATIONS IN A PRODUCT ION LINE USING OPTIMIZATION VIA SIMULATION TECHNIQUE. JOURNAL OF INDUSTRIAL MANAGEMENT STUDIES, 15(46 ), 57-71. SID. https://sid.ir/paper/213217/en

    Vancouver: Copy

    COMPANY MOHAMMAD SAEED, AZIMI PARHAM. DEVELOPING AND SOLVING A NEW BI-OBJECTIVE MODEL TO ASSIGN HUMAN RESOURCE AND EQUIPMENT TO PARALLEL WORKSTATIONS IN A PRODUCT ION LINE USING OPTIMIZATION VIA SIMULATION TECHNIQUE. JOURNAL OF INDUSTRIAL MANAGEMENT STUDIES[Internet]. 2017;15(46 ):57-71. Available from: https://sid.ir/paper/213217/en

    IEEE: Copy

    MOHAMMAD SAEED COMPANY, and PARHAM AZIMI, “DEVELOPING AND SOLVING A NEW BI-OBJECTIVE MODEL TO ASSIGN HUMAN RESOURCE AND EQUIPMENT TO PARALLEL WORKSTATIONS IN A PRODUCT ION LINE USING OPTIMIZATION VIA SIMULATION TECHNIQUE,” JOURNAL OF INDUSTRIAL MANAGEMENT STUDIES, vol. 15, no. 46 , pp. 57–71, 2017, [Online]. Available: https://sid.ir/paper/213217/en

    Related Journal Papers

    Related Seminar Papers

  • No record.
  • Related Plans

  • No record.
  • Recommended Workshops






    Move to top