مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Verion

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

video

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

sound

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Version

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

View:

974
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Download:

0
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Cites:

1

Information Journal Paper

Title

PERFORMANCE INDICATORS STATUS OF ONE OF THE PUBLIC HOSPITALS BEFORE AND AFTER IMPLEMENTING PUBLIC-PRIVATE PARTNERSHIP (PPP)

Pages

  71-78

Abstract

 Background and Objective: Regarding various benefits of implementing the Public Private Partnership (PPP) in hospitals, this study was conducted to compare the main PERFORMANCE INDICATORS of Hasheminejad hospital before and after implementing PPP model.Materials and Methods: This study was analytical, comparative, and crosssectional research that conducted in 2015. Status PERFORMANCE INDICATORS of Hasheminejad hospital were collected based on checklist before and after PPP implementation. Data were analyzed applying t-test in SPSS21 at a significant level of 0.05.Results: Changes in all of the indicators studied before and after the implementation of the PPP pattern were statistically significant (p<0.05).Percent of bed occupation changed from 76.18 to 81.36, average length of stay from 5.1 to 4.46, and bed circulating rate from 4.62 to 5.72. Additionally, admission rates, clinic referrals, emergency referrals, and number of surgeries significantly increased after PPP implementation.Conclusion: There are dramatic variations in the status of the studied indicators after the implementation of the PPP in hospital. It is suggested that health system managers and policy makers provide the necessary conditions to use this approach in PUBLIC HOSPITALs across the country.

Cites

References

Cite

APA: Copy

SADEGHI, AHMAD, BASTANI, PEIVAND, BARATI, OMID, DANESHJAFARI, DAVOOD, ETEMADIAN, MASOUD, & JAVAN NOUGHABI, JAVAD. (2018). PERFORMANCE INDICATORS STATUS OF ONE OF THE PUBLIC HOSPITALS BEFORE AND AFTER IMPLEMENTING PUBLIC-PRIVATE PARTNERSHIP (PPP). DANESHVAR MEDICINE, 25(134 ), 71-78. SID. https://sid.ir/paper/31107/en

Vancouver: Copy

SADEGHI AHMAD, BASTANI PEIVAND, BARATI OMID, DANESHJAFARI DAVOOD, ETEMADIAN MASOUD, JAVAN NOUGHABI JAVAD. PERFORMANCE INDICATORS STATUS OF ONE OF THE PUBLIC HOSPITALS BEFORE AND AFTER IMPLEMENTING PUBLIC-PRIVATE PARTNERSHIP (PPP). DANESHVAR MEDICINE[Internet]. 2018;25(134 ):71-78. Available from: https://sid.ir/paper/31107/en

IEEE: Copy

AHMAD SADEGHI, PEIVAND BASTANI, OMID BARATI, DAVOOD DANESHJAFARI, MASOUD ETEMADIAN, and JAVAD JAVAN NOUGHABI, “PERFORMANCE INDICATORS STATUS OF ONE OF THE PUBLIC HOSPITALS BEFORE AND AFTER IMPLEMENTING PUBLIC-PRIVATE PARTNERSHIP (PPP),” DANESHVAR MEDICINE, vol. 25, no. 134 , pp. 71–78, 2018, [Online]. Available: https://sid.ir/paper/31107/en

Related Journal Papers

Related Seminar Papers

  • No record.
  • Related Plans

  • No record.
  • Recommended Workshops






    Move to top
    telegram sharing button
    whatsapp sharing button
    linkedin sharing button
    twitter sharing button
    email sharing button
    email sharing button
    email sharing button
    sharethis sharing button