مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Verion

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

video

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

sound

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Version

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

View:

2,811
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Download:

0
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Cites:

Information Journal Paper

Title

DEVELOPING A FUZZY RISK ASSESSMENT MODEL TO ASSESS THE SCHEDULE RISKS IN CONSTRUCTION PROJECTS (CASE: TRACK RENEWAL PROJECT IN IRAN RAILWAY ADMINISTRATION)

Pages

  109-133

Abstract

 Calculation of Derivations from every objective of the project is very important for both contractors and employers. Time overrun is the function of all project risks. A tool that can assess the risk levels and estimate the derivations from the planed duration is very useful for contractors. This research tries to propose a new methodology to determine the schedule risk of CONSTRUCTION PROJECTS and the total time overrun. This methodology uses influence diagram to construct the risk model and fuzzy risk assessment system to estimate time overrun for every activity. Then the information of FUZZY RISK ASSESSMENT MODEL is used by scheduling the soft wares such as MSP or Primavera to calculate the time overrun of the project. This model has been used in one of the track renewal projects of Iran Railway Administration.The model was validated by using the estimated data produced by model and the real data of the activities’ duration. Then the mean absolute percentage error (MAPE) was calculated for the activities and the project. MAPE of the activities was equal to 10.75% and the estimated duration of project was equal to 105.24 time unit. In comparison with the real duration of project (which was equal to 113 time units and MAPE for the whole project was equal to 6.7%), it can be concluded that FUZZY RISK ASSESSMENT MODEL has remarkable accuracy to be used in CONSTRUCTION PROJECTS.

Cites

  • No record.
  • References

  • No record.
  • Cite

    APA: Copy

    BARADARANKAZEMZADE, REZA, & SHARIFMOUSAVI, SEYYED MAHDI. (2011). DEVELOPING A FUZZY RISK ASSESSMENT MODEL TO ASSESS THE SCHEDULE RISKS IN CONSTRUCTION PROJECTS (CASE: TRACK RENEWAL PROJECT IN IRAN RAILWAY ADMINISTRATION). MANAGEMENT RESEARCH IN IRAN (MODARES HUMAN SCIENCES), 15(1 (70)), 109-133. SID. https://sid.ir/paper/357156/en

    Vancouver: Copy

    BARADARANKAZEMZADE REZA, SHARIFMOUSAVI SEYYED MAHDI. DEVELOPING A FUZZY RISK ASSESSMENT MODEL TO ASSESS THE SCHEDULE RISKS IN CONSTRUCTION PROJECTS (CASE: TRACK RENEWAL PROJECT IN IRAN RAILWAY ADMINISTRATION). MANAGEMENT RESEARCH IN IRAN (MODARES HUMAN SCIENCES)[Internet]. 2011;15(1 (70)):109-133. Available from: https://sid.ir/paper/357156/en

    IEEE: Copy

    REZA BARADARANKAZEMZADE, and SEYYED MAHDI SHARIFMOUSAVI, “DEVELOPING A FUZZY RISK ASSESSMENT MODEL TO ASSESS THE SCHEDULE RISKS IN CONSTRUCTION PROJECTS (CASE: TRACK RENEWAL PROJECT IN IRAN RAILWAY ADMINISTRATION),” MANAGEMENT RESEARCH IN IRAN (MODARES HUMAN SCIENCES), vol. 15, no. 1 (70), pp. 109–133, 2011, [Online]. Available: https://sid.ir/paper/357156/en

    Related Journal Papers

    Related Seminar Papers

  • No record.
  • Related Plans

  • No record.
  • Recommended Workshops






    Move to top
    telegram sharing button
    whatsapp sharing button
    linkedin sharing button
    twitter sharing button
    email sharing button
    email sharing button
    email sharing button
    sharethis sharing button