مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Verion

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

video

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

sound

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Version

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

View:

428
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Download:

221
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Cites:

Information Journal Paper

Title

Impact of PFMEA Implementation with Fuzzy Approach on Improving Overall Equipment Effectiveness in the Sugar Industry

Pages

  199-226

Keywords

OEEQ1
RPNQ2

Abstract

 The purpose of this study was to investigate the effect of the implementation of the PFMEA on the improvement of the overall equipment effectiveness (OEE) in a sugar factory. First, the average Overall Equipment Effectiveness in the production process in eight consecutive working weeks was extracted as a pre-test. Then, the types of potential failures in the production process were identified and the three parameters of the severity of the failures, the probability of occurrence of the failures and the probability of failures detection for each failure mode were extracted in linguistic variable and determined by group discussion and by collective agreement and multiplied by corresponding numerical values These three parameters in each other, the number of priority numbers for each failure, was calculated. In the next step, 24 priority failures were identified by the severity-occurrence matrix and risk ranking table. Then, appropriate strategies for reducing the effects or eliminating prioritized failures were identified and implemented, corrective actions and necessary interventions were planned over a period of eight weeks. During the implementation of the interventions and at the end of each week, the Overall Equipment Effectiveness was calculated as a post-test. At the end of the study, the relationship between the risk priority number (RPN) and OEE was studied in the form of the Pearson correlation.

Cites

  • No record.
  • References

  • No record.
  • Cite

    APA: Copy

    Baghbani, Mohammad, IRANZADEH, SOLEYMAN, & BAGHERZADEH KHAJEH, MAJID. (2020). Impact of PFMEA Implementation with Fuzzy Approach on Improving Overall Equipment Effectiveness in the Sugar Industry. PUBLIC MANAGEMENT RESEARCHES, 12(46 ), 199-226. SID. https://sid.ir/paper/373535/en

    Vancouver: Copy

    Baghbani Mohammad, IRANZADEH SOLEYMAN, BAGHERZADEH KHAJEH MAJID. Impact of PFMEA Implementation with Fuzzy Approach on Improving Overall Equipment Effectiveness in the Sugar Industry. PUBLIC MANAGEMENT RESEARCHES[Internet]. 2020;12(46 ):199-226. Available from: https://sid.ir/paper/373535/en

    IEEE: Copy

    Mohammad Baghbani, SOLEYMAN IRANZADEH, and MAJID BAGHERZADEH KHAJEH, “Impact of PFMEA Implementation with Fuzzy Approach on Improving Overall Equipment Effectiveness in the Sugar Industry,” PUBLIC MANAGEMENT RESEARCHES, vol. 12, no. 46 , pp. 199–226, 2020, [Online]. Available: https://sid.ir/paper/373535/en

    Related Journal Papers

    Related Seminar Papers

  • No record.
  • Related Plans

  • No record.
  • Recommended Workshops






    Move to top
    telegram sharing button
    whatsapp sharing button
    linkedin sharing button
    twitter sharing button
    email sharing button
    email sharing button
    email sharing button
    sharethis sharing button