مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Verion

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

video

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

sound

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Version

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

View:

661
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Download:

0
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Cites:

Information Journal Paper

Title

Develop and Select A Strategy for Interaction with Stakeholders During the Project Life Cycle in Oil Projects

Pages

  347-362

Abstract

 Purpose: The aim of this study was to develop and select a strategy for interacting with stakeholders during the project life cycle in oil projects using SWOT matrix in Excel, fuzzy tops method and a proposed mathematical model in Pars Oil and Gas Company. Methodology: For this purpose, 9 strengths, 8 weaknesses, 7 threats and 8 opportunities were presented by Swat Processing Matrix and then 15 proposed strategies using the views of a sample of 23 people available from experts in the studied projects. Then, the ranking of strategies was performed by fuzzy topsis method in Excel, and in the last step, the proposed mathematical model was solved in Gamz software and the strategy of interaction with stakeholders was determined. Findings: Findings showed that the numerical value of internal factors was 0. 124 and the numerical value of external factors was 0. 003. Therefore, the strategic position of the company was in the first area and it is necessary to put aggressive strategies on the agenda of this company. Also, the ranking of strategies was done using fuzzy topsis method and the findings of solving the mathematical model to select the optimal strategy of interaction with stakeholders showed that the results of the mathematical model are different from the result of multi-criteria decision making and each strategy can relate to several conflicts Improve stakeholders. Originality/Value: This article adds scientific value by providing a way to identify, prioritize and determine appropriate strategies for interacting with stakeholders.

Cites

  • No record.
  • References

  • No record.
  • Cite

    APA: Copy

    Rezaei, Raman. (2021). Develop and Select A Strategy for Interaction with Stakeholders During the Project Life Cycle in Oil Projects. INNOVATION MANAGEMENT AND OPERATIONAL STRATEGIES, 1(4 ), 347-362. SID. https://sid.ir/paper/393016/en

    Vancouver: Copy

    Rezaei Raman. Develop and Select A Strategy for Interaction with Stakeholders During the Project Life Cycle in Oil Projects. INNOVATION MANAGEMENT AND OPERATIONAL STRATEGIES[Internet]. 2021;1(4 ):347-362. Available from: https://sid.ir/paper/393016/en

    IEEE: Copy

    Raman Rezaei, “Develop and Select A Strategy for Interaction with Stakeholders During the Project Life Cycle in Oil Projects,” INNOVATION MANAGEMENT AND OPERATIONAL STRATEGIES, vol. 1, no. 4 , pp. 347–362, 2021, [Online]. Available: https://sid.ir/paper/393016/en

    Related Journal Papers

    Related Seminar Papers

  • No record.
  • Related Plans

  • No record.
  • Recommended Workshops






    Move to top
    telegram sharing button
    whatsapp sharing button
    linkedin sharing button
    twitter sharing button
    email sharing button
    email sharing button
    email sharing button
    sharethis sharing button