Information Journal Paper
APA:
CopyJOHNSON, S.M.. (1954). OPTIMAL TWO- AND THREE-STAGE PRODUCTION SCHEDULES WITH SETUP TIMES INCLUDED. NAVAL RESEARCH LOGISTICS QUARTERLY, 1(1), 61-67. SID. https://sid.ir/paper/598606/en
Vancouver:
CopyJOHNSON S.M.. OPTIMAL TWO- AND THREE-STAGE PRODUCTION SCHEDULES WITH SETUP TIMES INCLUDED. NAVAL RESEARCH LOGISTICS QUARTERLY[Internet]. 1954;1(1):61-67. Available from: https://sid.ir/paper/598606/en
IEEE:
CopyS.M. JOHNSON, “OPTIMAL TWO- AND THREE-STAGE PRODUCTION SCHEDULES WITH SETUP TIMES INCLUDED,” NAVAL RESEARCH LOGISTICS QUARTERLY, vol. 1, no. 1, pp. 61–67, 1954, [Online]. Available: https://sid.ir/paper/598606/en