Information Journal Paper
APA:
CopyAGGARWAL, S., GUPTA, D., & SHARMA, S.. (2013). BI-CRITERIA THREE STAGE FUZZY FLOWSHOP SCHEDULING WITH TRANSPORTATION TIME AND JOB BLOCK CRITERIA. INTERNATIONAL JOURNAL OF APPLIED OPERATIONAL RESEARCH, 3(1), 41-53. SID. https://sid.ir/paper/609178/en
Vancouver:
CopyAGGARWAL S., GUPTA D., SHARMA S.. BI-CRITERIA THREE STAGE FUZZY FLOWSHOP SCHEDULING WITH TRANSPORTATION TIME AND JOB BLOCK CRITERIA. INTERNATIONAL JOURNAL OF APPLIED OPERATIONAL RESEARCH[Internet]. 2013;3(1):41-53. Available from: https://sid.ir/paper/609178/en
IEEE:
CopyS. AGGARWAL, D. GUPTA, and S. SHARMA, “BI-CRITERIA THREE STAGE FUZZY FLOWSHOP SCHEDULING WITH TRANSPORTATION TIME AND JOB BLOCK CRITERIA,” INTERNATIONAL JOURNAL OF APPLIED OPERATIONAL RESEARCH, vol. 3, no. 1, pp. 41–53, 2013, [Online]. Available: https://sid.ir/paper/609178/en